My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-24-1991 Council Packet
Orono
>
City Council
>
1991
>
06-24-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2024 11:14:59 AM
Creation date
6/24/2024 11:04:45 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
607
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
p.*W. <br />.vjgessment Forrmia <br />The total cost of Sanitary Sewer Project No. '3-1 including <br />construction costs and indirect costs is SI,^322«113. r roni ,.hi^ <br />amount the above described truck cost, possible future assessment <br />revenue, possible future trunk revenue and assessed trunk revenue <br />are deducted. The remaining amount of Sl,4<j6,519 is assessed <br />as a lateral benefit. The lateral benefit is divided into 40% <br />placed against front footage and 60% placed against building <br />unit for purposes of providing eguity in division of the costs <br />to various shaped lots. <br />a. Unit <br />A building unit is defined as the mi.nimum allowable <br />width parcel containing adequate area to meet tne requirements <br />of the zoning code for the district in which the property is <br />located. Wliere progerties have sufficient width and area to <br />be subdivided they arc assessed the whole number of maximum <br />unit- into which the property can be subdivided if ail such <br />subdivided lots hove sewer contiguous to t.hem. <br />Certain existing properties do not meet the minimum stan <br />dards for tlie lot dimensions in the toned use district in which <br />they exist, in those instances the properties are combined <br />into a logical pattern ’ield a lot as near as possible to <br />the minimum standards for tha- use district. Each substandard <br />lot is the assessed a fraction- it based oi. the number of <br />lots required to make the larger lot. <br />b. Front Footage <br />The front footage to be assessed is determined according <br />to the following guidelines: <br />a. On recta.ngular lots, the width of the lots is assessed. <br />b. On corner rectangular lots, the least dimension is con <br />sidered the width of the lot. . . <br />c. On lots wich a varying width, the average width is <br />assessed. , _. <br />d. On pie shaped or triangular parcels and on <br />where no definite width can be determined, the width <br />assessed is calculated as the prorated minimum width <br />baaed on the lot area. <br />-3- <br />4
The URL can be used to link to this page
Your browser does not support the video tag.