■•.■Am <br />Pcoject 80-1 - In this pcoj*“Ct th^ original asspssm«*nt <br />had been made prior to the project completion. The City <br />subsequently reduced the project assessment to reflect <br />the actual costs of the project. <br />Project 73-1 - After the initial assessment the project <br />assessment was reduced by the City prior to a final <br />Court disposition for those who participated in the <br />appeal process (123 of 266) parcels in the project with <br />the possibility that the city may have to pay for <br />additional assessments over and above those that they <br />had picked up on the front end. This however, was not <br />required because the combination of a refunding of the <br />bond issue for a lower interest payment, prepayments and <br />high interest rates in the late WO's^ Cover<»)the entire <br />cost. <br />fci;: <br />Project 85-1 (Crystal Bay) - This was the second project <br />according to the records that went to Court as an appeal <br />and which was reduced because of that. It is the only <br />project that the amount of the assessment reduction has <br />made it necessary to levy taxes to fund the debt service. <br />The following represent the area served and the approximate per <br />unit costs of the projects and the year in which they were done; <br />PROJECT AREA SERVED ASSESSMENT <br />1963-lA/B Navarre Area Sewer Plant $225.00/'w.nit <br />1963-ST/LS Navarre Area Sewer Lines $110.00/Acre plus <br />$8.00/PF (Front Foot) <br />1964-LS Navarre Area Sewer Lines $225.Q0/Unit plus <br />$8.15/FF <br />1965-LS (Fagerness Point) Sewer Lines <br />7.. • <br />$225.00/Unit plus <br />$8.76/FF <br />1965-LS (Sandy Beach) Sewer Lines $225.00/Unit plus <br />$12.00/FF <br />f 1967-LS-l <br />i , -t,- <br />Orono B.S. & South Side of <br />Hwy 12 from Willow Dr to <br />Old Crystal Bay Road - Sewer <br />1976-LW-l - Water <br />$60.00/Unit plus <br />$5.99/FF <br />$1050.33/Unit plus <br />$7.79/FF <br />w <br />-it- <br />1969-LS-l Shore Hills Sewer Lines - <br />Navarre <br />$225.00/Conn <br />(Connection) plus <br />$3211.33/Unit <br />f *•' <br />■