My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-24-1991 Council Packet
Orono
>
City Council
>
1991
>
06-24-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2024 11:14:59 AM
Creation date
6/24/2024 11:04:45 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
607
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f. . <br />tf <br />r. ■ <br />% <br />ORONO CITY COUNCIL MEETING HELD MAY 20. 1991 <br />(17)ZONING FILE f1641-KEAVENY CONTINUED <br />15 foot setback. <br />Mabusth stated that the bjilding will meet the setback, it <br />is the landscaping proposed at the north, east and south side of <br />the structure that will be 30 feet from Kel..y Avenue. <br />Butler asked why such a permanent building design is being <br />used, as opposed to bringing in a mobile unit of some sort. <br />Mabusth stated that the permanent aspect of che structure is <br />necessary because of the pumping equipment it will house. <br />Butler asked Mabusth for the dimensions of the building. <br />Mabusth replied, "The building will be 10' x 23’." <br />Mayor Peterson asked if the applicant has orovided the daily <br />flo- of treated water discharged into sanitary sewer. <br />Mabusth explained that the applicant will be required to <br />provide that in conjunction with the building permit process. <br />The information is necessary so the City can determine to what <br />extent the disenarged treated water will impact the sewer system <br />and whether to bill them for a 5AC unit. She informed Council <br />that the MWCC does not normally charge a SAC unit in cases such <br />as this. <br />Mayor Peterson asked how often the City will require <br />applicant to submit information regarding the results of <br />teats. <br />the <br />the <br />Gerhardson stated that such reports are normally submitted <br />on a quarterly basis. He added that the Metropolitan Waste <br />Control Commission charges a "Strength Charge" because the <br />product that will be put into the sewer system must be soecially <br />treated. <br />Bernhardson recommended tnat the agreement between the <br />parties could limit alternate uses of the property while the <br />C..orary structure exists and that would serve as another <br />incentive to remove the structure. <br />Council agreed with Bernhardson's suggestion. <br />It was moved by Butler, seconded by w^abbour, to approve the <br />Conaercial Site Plan, as presented by Richard Keaveny, subject to <br />tho applicant's preparation of an agreement, to be reviewed by <br />the City Attorney, that will be entered into by the City of Orono <br />and the applicant. The agreement is to incorporate the <br />reconnendations as discussed by Council. All voted «ye. Motion <br />passed. <br />- 8 - <br />W.I- It
The URL can be used to link to this page
Your browser does not support the video tag.