My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-24-1991 Council Packet
Orono
>
City Council
>
1991
>
06-24-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2024 11:14:59 AM
Creation date
6/24/2024 11:04:45 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
607
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I:" <br />I <br />4- : <br />.» >.»*■ . <br />■-' ?' <br />,'.-\r. <br />^y- <br />. -y <br />>;■ <br />'?.m <br />Zi' V <br />r, ;>' <br />;: .*-,V''. <br />V ■ <br />!:,A, <br />’ ? <br />i’. <br />■t^■‘ ■'ti:V'.V <br />;A'v^ <br />-V <br />A"' <br />.} ' <br />•:';n <br />4 490.*^ <br />TOz <br />FROM: <br />DATE: <br />Mayor and City Council <br />Mark E. Bctnhardson, City Administrator <br />April 4, 1990 <br />SUBJECT: Stubbs Bay Sewer Project <br />Attachments: A. Stubbs Bay Sewer Project Memo Dated 3/14/90 <br />B. Series of Maps Labeled A Through F <br />ISSUE - <br />1. Consideration of: <br />A. Inclusion of properties presently not included. <br />B. Consideration for excluding selected properties which <br />are currently being considered in the Stubbs Bay area. <br />INTRODUCTION - At the Council's March 26, 1990 meeting Council <br />requested staff to provide criteria and provide recommendation <br />for inclusion of selected areas and exclusion of others in the <br />Stubbs Bay project. <br />The original study area boundary criteria was: <br />A. As shown of map 12 of Comp Plan/Sewet Plan. (See <br />Attached Map A.) <br />B. Refined by staff in 1986 to coincide with existing <br />roads and physical boundaries: <br />C. Map A and staff revisions purposely avoided north of <br />Luce Line, west of Tonkawa, and south of Bayside <br />(eastend) since these properties were all subdivided <br />after the 1975 rezoning at greater than 2 acre density, <br />with proven septic sites availc;ble and were relatively <br />far from the lake. <br />D. Areas east of Leaf and north of Luce Line were also <br />excluded due to distance from the lake. <br />DISCUSSION “ In response to the Council's request, the following <br />reconienilations arc made: <br />Required Inclusion: <br />feels the criteria for required inclusion in this project <br />should be: <br />A. Within the study area as originally defined or <br />B. Abutting the study area but under 2 acres. <br />i
The URL can be used to link to this page
Your browser does not support the video tag.