My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-1991 Council Packet
Orono
>
City Council
>
1991
>
05-28-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2024 2:10:25 PM
Creation date
6/14/2024 2:06:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
U. <br />i. <br />r <br />I <br />f- <br />- <br />r-' <br />> <br />F? <br />I'S'l <br />Vr <br />t ,a' <br />Navarre Heights Storm Sewer March 20# 1991 <br />Page 3 of 3 <br />RBCOMMENDATION - It is recommended that the Council make initial <br />comments on what they feel would be an appropriate financing of <br />this and that if interesed in the project going forward that <br />Council direct plans and specifications be approved and that the <br />City advertise for bids. It is anticipated that these bids would <br />be presented to Council at its May 13, ISi'l Council meeting. It <br />is additionally recommended that if Council has a desire to go <br />with the sepcial assessment that the public hearing for the <br />special assessment be held at that time. The Council can then <br />wait the 30 days to determine what appeals, if any, would be <br />coming in and then corid determine whether they will order the <br />project in or not. It is suggested for the Engineer that the <br />closing date for tne bids be one week before the public hearing <br />and that they be valid for 60 days. <br />PROPOSED MOTION - Moved by seconded by that the Council <br />after conducting and closing the public hearing direct staff to <br />undertake advertisement for bids to close May 8, 1991 and that <br />such bids be valid for a minimum of 60 days during which time the <br />Council can hold a public hearing and if desired adopt a special <br />assessment to give the 30 day waiting period prior to <br />determination as to whether the project should be undertaken or <br />not. Ayes , Nays <br />CCS John R. Gerhardson, Public Works Director <br />Karen Cuff, 3572 Livingston Avenue, Wayzata 55391 <br />Tony Gleekel, 100 Washington Sq Bldg, Mpls 55401 <br />Robert Mitchell, Lindquist 6 Vennum, 740 East Lake St, <br />Wayzata 55391 <br />y . <br />J
The URL can be used to link to this page
Your browser does not support the video tag.