Laserfiche WebLink
Todd Ziesnterr 3440 Bayside Road <br />May 1, 1991 <br />Page 2 of 4 <br />5. Because soil testing has indicated that soils in the <br />front yard are not suitable for permanent use of a trench <br />type drainfield, this system is approved on a temporary <br />basis. The following events shall trigger abandonment of <br />this temporary system and construction of the approved mound <br />system in the rear yard within 90 days: A) a final <br />determination by the City Council that this property will <br />not be served by city sewer; or B) any incident of surface <br />discharge of sewage; or C) sale of the residence. This <br />approval is not transferable to a new owner. <br />6. The property owner bears the responsibility for <br />maintaining the holding tank/temporary drainfield system so <br />that it does not become a health or safety hazard nor a <br />public nuisance. <br />7. At such time that City sewer becomes available, <br />the property owner agrees to connect the residence to the <br />sewer in the standard 16 month time period allowed for such <br />connection . <br />8. Your current contract with E.J. Peterson Company for <br />regular pumpout shall be continued in effect until such time <br />that the holding tank system is abandoned. <br />This agreement shall be effective upon receipt of a copy of <br />the agreement signed by the property owner (and a representative <br />of owner's mortgage holder, if one exists), properly notarized in <br />the spaces provided. <br />Sincerely, <br />MPG/tln <br />Michael P, Gaffron, <br />Asst Planning 6 Zoning Administrator <br />4 <br />U