Laserfiche WebLink
m <br />■■■ <br />*5'. <br />fer <br />Z<mlng Fil« #1638 <br />April 11# 1991 <br />P«9« 3 of 3 <br />4* Approval of variances will result in ninlsiuiii impact on <br />existing Improvements and allow functional use of the <br />limited site. <br />Denial. Denial baaed on the position that it is not <br />appropriate for the City to grant variances for either a <br />permanent or temporary use» especially since the temporary nature <br />of this use has not been defined as far as the period of time in <br />use. If this structure Is to be used by the City at a later <br />date# then it may be appropriate for the City to acquire a more <br />suitable site for the Installation of the pole barn as the pole <br />bam will be Installed with a full foundation. <br />The Public HOrks Department may be given an option to select <br />a larger facility if site selected has municipal water available. <br />In addition# It would be a savings to the City because there <br />would be no need to reinstall structure at a later date. <br />April 30# 1991 <br />and Planning sioo leoonmendatlon - <br />The Planning commission recommended unanimous approval of <br />the variances proposed by the City for the installation of the <br />temporary storage facility* 50*x96*. The Planning Commission <br />Members noted the following findings and hardshipsi <br />1. A hasardous condition exists posing a serious liability <br />for the cltlsens and employees of Orono. <br />2. It Is inappropriate for the City to effectively re-do <br />the entire site to reinstall required improvements as the <br />building will be Installed on a future site meeting all <br />required setbacks and standards of the sonlng code. <br />3. The structure Is being installed for a temporary period <br />of time and will be reinstalled at a permanent* larger site <br />at a future date.