My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
06-10-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2024 4:52:09 PM
Creation date
6/6/2024 4:51:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City View Plumbing, HVAC, & Water <br />Conditioning <br />1880-B West Wayzata Blvd <br />P.O. Box 150 <br />Long Lake, MN 55356 <br />www.CityViewPlumbing.com <br />Phone: 952-473-8793 <br />Plumbing License # PC644178 <br />Mechanical License #MB005208 <br />Estimate 140414373 <br />Estimate Date 5/10/2024 <br />Billing Address <br />Orono, City of <br />2700 Kelley Parkway <br />Long Lake, MN 55356 USA <br />Job Address <br />Public Works <br />2700 Kelley Parkway <br />Long Lake, MN 55356 USA <br />Description of work <br />Proposing the following plumbing modifications per site visit completed on 5/6/24. <br />Service #Description Quantity Your Price Total <br />Contract Kitchen Area: <br />1. Modify existing drains and water lines as necessary to convert single sink <br />plumbing to double sink and dishwasher plumbing rough in. <br />2. Install water line and connect to existing refrigerator. <br />3. Hook up kitchen sink and faucet furnished by others. <br />4. Hook up dishwasher, drain, and water lines. <br />New Laundry Area: <br />1. Subcontract with Concrete Cutting & Coring to saw cut floor as needed to <br />access waste line in the floor. <br />2. Core drill walls for plumbing, v ent piping, and dryer vent piping. <br />3. Subcontractor will haul away cement debris and they will re-cement the <br />floor. <br />4. Rough in the waste line for washing machine and extractor machine. <br />5. Install plumbing vent line and connect to existing cast iron plumbing vent <br />line near ceiling 2 bays over from the laundry room. <br />6. Rough in hot & cold water line and connect to existing piping in the main <br />shop ceiling area. <br />7. Vent electric dryer to exterior wall of laundry room area. <br />8. Hook up owner furnished washer, dryer, and extractor machines. <br />1.00 $18,937.00 $18,937.00 <br />Sub-Total $18,937.00 <br />Tax $0.00 <br />Total Due $18,937.00 <br />Deposit/Downpayment $0.00 <br />Thank You For Your Business! <br />Please Remit Payment to: <br />City View Plumbing <br />P.O. Box 150 <br />Long Lake, MN 55356 <br />Payment Terms: Any project in excess of $1000 we require a 50% down payment prior to scheduling the work with the remainder of <br />the balance due upon receipt of the final invoice. Any project below $1000 dollars the balance of the project is due upon receipt of the <br />final invoice. <br />• Payment By Check: Checks can be made out to the following; City View Plumbing and Heating, P.O. Box 150, Long Lake, MN 55356 <br />• Payment By Card: We accept all major cards. <br />73
The URL can be used to link to this page
Your browser does not support the video tag.