Laserfiche WebLink
1999 Goals <br />Page 2 <br />14. Develop a City assessment policy. <br />A. Sewer. <br />B. Roads. <br />1) Reconstruction. <br />a) Lccal streets. <br />b) MSA roads. <br />2) Overlays. <br />15. Construct the lift station to provide an overflow sewer capacity connection to the Metro <br />interceptor as an interim expansion of sewer capacity in the Highway 12 area. <br />16. Conduct a salary survey to determine if the City's pay schedule is competitive 'vith <br />comparable cities.