My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-1998 Council Packet
Orono
>
City Council
>
1998
>
09-14-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 4:03:32 PM
Creation date
6/5/2024 3:55:42 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br />Date: August 20,1998 <br />1Item No. <br />Department Approval:Administrator Approval: <br />Name: Michael P. Gaffiron <br />Title: Senior Planning Coordinator <br />Agenda Section: <br />Zoning <br />Item Description: #2404 Otten Brothers Nursery, 2350 West Wayzata Boulevard - Commercial <br />Site Plan Approval (Amend PUD Agreement) <br />Zoning District: <br />Application: <br />B-6 (PUD-1), Highway Commercial District, Planned Unit Development <br />Request for commercial site plan approval for construction of a greenhouse <br />addition adjacent to the existing principal structure. <br />List of Exhibits <br />A - Revised/Corrected Survey <br />B - Letter & Photos from Neighboring Property Owners <br />C - Memo and Exhibits of 8-14-98 <br />Summary of Request <br />Otten Brothers Nursery and Landscaping is preparing to construct a 132'xl44' greenhouse addition <br />at t.ie ca^t end of the main building. This greenhouse will cover a portion of the current open sales <br />area which is surrounded by an open canopy structure (see Exhibits D, E & F of 8/14 memo). The <br />gr:enhouse area will be used for virtually the same retail sales funcUon as currently exists, but will <br />provide for a more controlled environment. No site grading is anticipated as part of the greenhouse <br />project, and the existing bituminous walkways will remain fn place. <br />An existing 40'x90 ’ canopy section will be removed to allow greenhouse construction, and this <br />canopy is proposed to be relocated further north on the site, as shown on the revised corrected <br />survey. Exhibit C. That survey also shows the boundaries of the Otten holdings which ^e <br />coirjnercially zoned, and indicate the location of a new retaining wall / loading dock under <br />construction (without the required land alteration permit) on the future road corridor outlot. <br />i
The URL can be used to link to this page
Your browser does not support the video tag.