My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-1998 Council Packet
Orono
>
City Council
>
1998
>
09-14-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 4:03:32 PM
Creation date
6/5/2024 3:55:42 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Denotes Iron mon 8 shown ore based <br />JUL-Q6-1S?3 17:03 MIMMEH h H h CPEEI Mh TEPSHEE' <br />MCWT) PERMIT APPLICATION; 98-98 <br />bll'4710.£.;52 P.Q4 04 <br />REPORT DATE: 6-30-98 <br />Applicant: Christine Vaierius <br />-3750 Bavside ko'ad <br />• ■ • <br />-Orono. MN 55364 <br />Location: Esavne) <br />PID; .05-117-23-02 <br />Representative; Coffin &. Grrmhfirp> <br />482 Tamarack Avenue <br />Long Lake. MN 55356 <br />Subwatershed: U-10 <br />SubSubwatersfaed; <br />Applicable Rules: Rule B. Stormwater management <br />Exhibits Received: Site plans Runoff calculations <br />Preliminary city approval Mailing labels <br />Application Received: Xune 18, 1998 Application Complete: June 29, 1998 <br />Noticing Requirements: Mailed to residents w/in 600’ of project on: 7-01-98 <br />Wetland Conserv ation Act Notice mailed on: <br />Reviewed by: Mike Panzer, Steve Schmunk, Jim Hafner <br />Project Review Status by Other Governmental Units: Preliminary approval, City of Orono <br />DNR General Permit: <br />Recommendations: Approval. I&juc pcrmil upon receipt of signed maintenance agreement <br />Review & Summary': This project involves the division of a 4.5 acre parcel into two .teparate lots. The applicant <br />is proposing to construct a stormwater treatment pond to provide both rate coniro! and water quality treatment A pond <br />would not necessarily be the preferred method of meeting the provisions of Rule B given the low densitj' of the <br />development and the fact that a significant portion of the site is wetland, but the applicant prefers this method. <br />Review based on: <br />1 . Calculations dated June 27, 1998, atid received on June 29 , 1998. <br />2. Plan sheet dated June 27, 1998, and received on Jiuie 29. 1998. <br />1. <br />Ruled Time*: Slaff S37.50 <br />Engrs $48.00 <br />Legal <br />Mailing co.st.v: <br />'I'otal to date: <br />S35 SO <br />5121 30 <br />* Rule J fees cannot be collected from public agencies. Fees lisied in tliis report mav not be the <br />final total incurred for the application. <br />34.85 <br />TOTmL P.CU
The URL can be used to link to this page
Your browser does not support the video tag.