My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-09-1998 Council Packet
Orono
>
City Council
>
1998
>
11-09-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:54:11 PM
Creation date
6/5/2024 3:47:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
69 <br />70 <br />71 <br />72 <br />73 <br />74 <br />75 <br />76 <br />77 <br />78 <br />79 <br />80 <br />82 <br />33 <br />84 <br />85 <br />86 <br />37 <br />88 <br />89 <br />90 <br />15" RCP nared end in place with trash guard <br />Mechanical trench compaction <br />Improved pipe fnd. in 6" increment depth <br />Remove existing CMP culvert <br />Furnish and install 15" CMP culvert <br />15" CMP nared end <br />Riprap, Class III hand placed <br />Sod with 4" topsoil <br />Seed with topsoil, mulch and fertilizer <br />Erosion control fence <br />Wood fiber blanket <br />Furnish and plant Evergreen Tree (Blue <br />Spruce) 6* high <br />Furnish and plant shade tree (Sugar Maple) <br />4 ‘ diameter <br />Remove and replace wood or chain link fence LF <br />Remove and transplant bushes <br />Remove and transplant tree • Desiduous <br />Remove and transplant tree • Coniferous <br />Salvage and reinstall wood guard post <br />Total Part 3 - Restoration <br />Part 4 • Ice Arena Duplex Grinder Station <br />Duplex submersible grinder station <br />2" HOPE. SDR 11 <br />Connect to existing manhole <br />2" HOPE 45 degree bends <br />Total Pan 4 - Ice Arena Duplex Grinder Station <br />EA 2 900.00 1 900.00 <br />LF 595 1.00 207 207.00 <br />LF 595 0.01 <br />LF 450 2.00 100 200.00 <br />LF 450 12 00 427 5.124.00 <br />EA 30 100.00 16 1.600.00 <br />CY 12 30.00 22 660.00 <br />SY 28.0C0 2.25 20281 45.632.25 <br />AC 2 1.550.00 0.9 1.395.00 <br />LF 1.000 2.50 1336 3.340.00 <br />SY 750 1.50 524 786.00 <br />EA 6 225.00 6.5 1.462.50 <br />EA 6 500.00 1 500.00 <br />LF 600 15.00 100 1 .-500.00 <br />EA 12 75.00 <br />EA 12 150.00 <br />EA 15 150.00 <br />EA 11 50.00 11 550.00 <br />S289.597.15 <br />LS 1 13.600.00 1 13.600.00 <br />LF U60 6.00 1.105 6.630.00 <br />EA 1 1.000.00 1 1.000.00 <br />EA 2 50.00 2 100.00 <br />Part 5 • Lift Station 6 Renovation <br />Temporary controls, pumps and piping for <br />S26.330.00 <br />interim conveyance LS 1 2.000.00 1 2.000.00 <br />92 Lift station demolition I.S I 5.000.00 1 5.000.00 <br />93 New pumps, piping, valves, top hatch <br />and slab LS 1 35.000.00 1 35.000.00 <br />94 New control panel, base slab, dialer, and <br />miscellaneous electrical LS 1 24.000.00 1 24.00000 <br />95 Sod SY 50 2.25 50 ’112.50 <br />] <br />IA139M 3988Vequest 11 .wb2
The URL can be used to link to this page
Your browser does not support the video tag.