Laserfiche WebLink
5. <br />6. <br />B. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />Is this proposed land use change located adjacent to a principal arterial or "A" minor <br />arterial? [X] No [ ] Yes. please describe site access to the arterial, and whether <br />location and spacing of the access is consistent with Access Spacing Guidelines <br />Does the proposed plan revision or amendment positively or negatively affect pedestrian or <br />bike systems? [X] No [ ] Yes., please describe the effects <br />Wastewater Treatment <br />Total flow for community based on existing plan; <br />Year 2000: 0.68 million gallons/day (mgd) <br />Year 2010: 0.72 million gallons/day (mgd) <br />Total proposed flow for community, based on plan revision or amendment: <br />Year 2000: 0.69 million gallons/day (mgd) <br />Year 2010: 0.74 million gallons/day (mgd) <br />If community discharges to more than one metropolitan interceptor,. icate which <br />interceptor will be affected by the revision or amendment. <br />All flows from the proposed 155-acre expansion are intended to be directed <br />southeastward to the metro interceptor in South Old Crystal Bay Road which <br />abuts the southeast corner of this area. This interceptor discharges to Metro <br />Lift Station #59. <br />Will flows be diverted from one interceptor service area to another? [X] No <br />[ ] Yes., if yes, describe the change and volumes (mgd) involved <br />Is any wastewater flow an intercommunity flow to an adjoining community's sanitary <br />sewer system? [X]No [] Yes., if yes, enclose a copy of the inter-community <br />agreement. <br />None of the proposed additional flows are subject to intercommunity <br />agreements. <br />Has the community adopted a comprehensive program for the management of on-site <br />septic systems? [ ]No [X] Yes [ ] Not Applicable., please explain <br />Page 3 of 6