Laserfiche WebLink
Contract Unit Quantity Amount <br />Item Unit Quantity Price to Date'to Date <br />1 8" PVC. SDR 35. 8*- 10* deep in place LF 45 20.40 61.5 1.254.60 <br />2 8" PVC. SDR 35. 10 ’-12' deep in place LF 680 22.20 635 14.097.00 <br />3 8" PVC. SDR 35. 12’-14’ deep in place LF 320 24.50 260 6.370.00 <br />4 8- PVC. SDR 35.14’-16' deep in place LF 230 27.50 286 7.865.00 <br />5 8 ’ PVC. SDR 35.16 -18’ deep in place LF 300 31.40 300 9.420.00 <br />6 Connect 8” PVC to existing manhole EA 1 2.057.70 1 2.057.70 <br />7 Std. MH 8* dp.. 4’ dia., w/R1642B cstg.EA 9 1.552.40 9 13.971.60 <br />8 MH depth greater than 8‘ deep LF 39 •124.60 38.8 4.834.48 <br />9 Clean out manhole as per detail EA 1 1.867.40 1 1.867.40 <br />10 Directional bore 8" HDPE SDR 17 LF soo 47.50 489.5 23.251.25 <br />11 3" HDPE. SDR 11. trenched in place LF 810 13.10 1204 15.772.40 <br />12 Connect 3" HDPE to manhole as per detail EA 1 523.00 1 523.00 <br />13 1-1/2” curb stop & box. installed as per detail LF 5 190J0 7 1.332.10 <br />14 3” X 3" HDPE tee EA 5 55.30 7 387.10 <br />15 3" X 1-1/2” HDPE reducer EA 5 36.80 7 257.60 <br />16 1-1/2" HDPE SDR 11 LF 200 10.70 200 2.140.00 <br />17 8” X 4” PVC or HDPE compatible service <br />wye branch EA 13 168.00 17 2.856.00 <br />18 4" PVC service pipe in place. SDR 26 LF 480 13J0 480 6.480.00 <br />19 4” PVC service riser pipe in place. SDR 26 LF 170 13.50 170 2.295.00 <br />20 Improved pipe fdn. in 6” increment depth LF 3.150 3.20 100 320.00 <br />21 Mechanical trench compaction LF 2.250 0.10 2200 220.00 <br />22 Sanitary sewer television inspection LF 2.075 1.10 <br />23 Traffic control LS 0.75 2.351.30 0.75 1.763.48 <br />Total Part 1 - Sanitary Sewer 119335.71 <br />Part 2 - Restoration <br />24 Bituminous surfacing removal SY 2.600 2.00 2100 4.200.00 <br />25 Common excavation CY 700 7.80 700 5.460.00 <br />26 Class 5 aggregate base (100% crushed)TN 1.400 12.60 1032 13.003.20 <br />27 Type 31 bituminous base course TN 230 35.80 358 12.816.40 <br />28 Type 41A bituminous wearing course TN 380 30J0 <br />29 Geotextile fabric SY 1.700 1.40 1300 1.820.00 <br />30 Bituminous material for tack coat GL 50 2.20 <br />31 Bituminous street patching SY 590 24.90 680 16.932.00 <br />32 Clearing and grubbing LS 0.90 13.224.00 0.9 11.901.60