Laserfiche WebLink
ORONO CITY COUNCIL MEETING <br />MINUTES FOR SEPTEMBER 28.1998 <br />(Orono Orchards Sanitary Sewer Project, continued) <br />A resident expressed concern over the increase in taxes that will be experienced because of the <br />hookup to City sewer. <br />Mayor Jabbour stated it is not the desire of the City to increase taxes to the point where it forces <br />people into moving, but unfortunately the City is not able to selectively give ta.x reductions to certain <br />residents. Jabbour noted certain grants are available that residents can obtain to help pay for the <br />hookup. <br />Moorsc stated they have ongoing talks with the people who administer the CDBG grant program and <br />will research obtaining grant money through the agency. <br />Goetten stated there is a deferral available for people w ho are over 65 years of age. <br />Mayor Jabbour requested the City Administrator to review acquisition of grant monies further. <br />Kelley stated there is more pressure on the City of Orono to bring the failing and non-conforming <br />systems up to code. <br />(2B) 2090 SHORELINE DRIVE SEWER PROJECT - PUBLIC HEARING <br />A. Authorize Preparation of Plans and Specifications for 2090 Shoreline Drive Sanitary <br />Sewer Improvements • Resolution No. 4162. <br />Mr. and Mrs. Head were present. <br />Mayor Jabbour noted this item has been placed on tonight's agenda at the request of the Heads. <br />Kellogg stated the Heads have requested hookup to City sewer, noting this system will be a <br />pressure system because of the land elevations. This property consists of approximately four <br />acres, with one acre above floodplain. Presently there are three buildings on the site, with the two <br />primar)’ residences having their own septic system and the cabin having an outhouse. <br />The proposed s> stem w ill need to be directionally bored from the property under the lake to an <br />existing manhole at the intersection of Shoreline Drive and Birch Lane. The estimated costs for <br />this project arc approximately $34,000.00, which includes cverxihing on the overhead diagram as <br />well as a $5,000 cost for the grinder station. The grinder station and installation would be the <br />property owner's responsibility, noting that would be credited against the assessment. <br />Ma\or Jabbour stated the Heads have been talking about obtaining sewer for their property for some <br />time now. noting since the property is located on a peninsula, it is easier to direct it towards <br />Minnetonka Beach due to the closer proximity to the existing City sewer in that area. <br />Mayor Jabbour stated the City Council came to the conclusion to provide sewer to the two main <br />homes on the property previously, noting the Heads have requested two buildablc lots. Upon a <br />request from the Heads, the City Council has visited the property and have decided to allow the <br />Page 4