Laserfiche WebLink
Kenton & Diane Carlson <br />August 12,1998 <br />Page 2 of2 <br />5. <br />6. <br />7. <br />Although the footing foundation system is not ideal, the settlement is-ue outweieh.; th^. <br />It is my understanding that the contractor will accomplish the following: <br />a. Remove the top two courses of the existing foundation, <br />1?:'?":^ ^ -•» “>0 extending above <br />~ - —vvuAi til infirif*T" nisirvMr iA«tAi a • §§ m <br />continuous <br />the foundation. <br />Place concrete wall cap to proper height, level, and true with two #4 <br />With anchor bolts set at proper spacing. <br />PROFESSIONAL OPINimsi <br />*■ vish «>« based on the above information and site <br />ai4«e sISng cta'r"''"' <br />If you have any questions, please contact me. <br />Sincerely, <br />J. U. D EIER ENGINEERING, INC. <br />. Dahlmeier, P.E. <br />JHD:lm <br />Cc: City of Orono <br />Tom Betz/Betz Builders <br />wasI hereby certify that this plan, specification or report ___ <br />prepared by me or under my direct supervision and that I <br />am a duly registered professional engineer under the laws <br />of the State of Minnesota. <br />Minrfcsota Registration No. 9212