My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-1998 Council Packet
Orono
>
City Council
>
1998
>
09-28-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:41:55 PM
Creation date
6/5/2024 3:30:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
477
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO CITY COUNCIL MEETING <br />MINUTES FOR SEPTEMBER 14,1998 <br />MAYOR/COUNCIL REPORT CONTINUED <br />Kelley asked if the noise study will include the east and west end of Orono. <br />Moorse stated the area of study is from close to Old Crystal Bay Road North over to Greenglen Park. <br />There will be 5 noise monitors located between Old Crystal Bay Road North and Greenglen Park <br />to monitor the noise frequency of the trains as they go by. This will help in determining what type <br />of mitigation is needed for future noise/vibration levels with the new road and railroad. <br />Goetten requested an update on the County Roads Projects. <br />Gappa stated that the last of the surcharge was taken off County Road 15 today. Once the surcharge <br />is removed, they will begin to construct lanes on the north side and have the traffic shift to north side <br />before winter. They plan on working on the south side until it freezes. <br />Gappa stated the grading is done on County Road 6. Mayor Jabbour commented that the rock was <br />not down yet. They plan on paving in September, Gappa stated. <br />Kellogg reported no construction will occur on Femdale Road North this fall. The plans are to bid <br />the project in January or February 1999 so we will be ready to go once the weight restrictions are <br />off in the spring. <br />Flint asked if anything is going to happen with Hennepin Parks and the trail along County Road 6. <br />Kellogg replied that no construction is planned until spring. Gappa, Glenn Cook and Kellogg met <br />with the County to discuss concerns they had, design standards, and what can or cannot be accepted. <br />Revisions have been made and submitted to Hennepin County. <br />Kellogg reported the Heritage Drive Sev/er Project is nearly complete, paving and sodding should <br />be done in the next few weeks. The Little Orchard sewer project is nearly complete, and they are <br />going to be jacking the sewer under Old Crystal Bay Road starting tomorrow. This should only take <br />two to three days, then it will be complete. <br />Kelley questioned Gappa on the signal heads for the stop light on Old Crystal Bay Road and <br />Highway 12. <br />Gappa replied he had received quotes and needs to send them to MNDOT. The signal heads should <br />be in place by November 9, 1998. <br />Goetten questioned the status of an interim solution to the County Road 15 safety issues.
The URL can be used to link to this page
Your browser does not support the video tag.