My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-1998 Council Packet
Orono
>
City Council
>
1998
>
08-24-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:29:26 PM
Creation date
6/5/2024 3:24:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPRING HILL GOLF CLUB <br />STATUS REPORT <br />CITY OF ORONO <br />MONTH ENDING July 1998 <br />1) PROGRESS RFPnpY; <br />A) CLEARING: rnmplAfo <br />B) GRADINC; Complete <br />C) SILT FENC E: Complete per plan with additions as needed <br />D) CLUBHOUSE: Construction began in June. Framing and mechanicaljn <br />progress. Entry drive paving to begin in mid September. <br />maintenance BUILDING; Complete. Site seeding to begin in <br />September. <br />TRANSPLANTING AND SALVAGE : Tree transplanting complete per plan <br />Additional trees to be added as needed. <br />3) TUNNELi Complete. Request release of bond for tunnel construction. <br />4) MISC. Golf cour^ construction to be complete at the end of August. At that time the <br />golf course will be completely seeded and the ‘Grow In ’ process will continue <br />through fall. To date, all erosion damage from spring and summer storms has been <br />repaired. <br />700 Spring Hill Road - \Vayzata,MN 55391
The URL can be used to link to this page
Your browser does not support the video tag.