Laserfiche WebLink
#2404 Otten Brothers <br />August 14,1998 <br />Page 5 <br />3. Will Planning Commission recommmend approval for the loading dock as proposed within <br />Outlot C, or should it be relocated within Lot 2? <br />4.Are there any specific site plan concerns regarding current use or activity at this site? <br />Staff Recommendation <br />1. <br />Staff recommends as follows: <br />Approval of an amendment to the PUD Agreement to allow construction of the greenhouse <br />as proposed. <br />Denial of the proposed location of the loading dock / retaining wall system ^ <br />with a recommendation that it be relocated to a site within Lot 2 that meets a 35 setback from2. <br />3. <br />4. <br />Outlot C. <br />Approval of the relocation of the 40'x90' canopy to a site east of the storage bins in Lot 1 that <br />meets a 35' setback to Outlot C. <br />Applicant to relocate the light posts at the Highway 12 entrance to meet a 5' setback from the <br />right-of-way. <br />Options for Action <br />1. Recommend approval per staff recommendation. <br />Recommend approval with additional or different conditions than staff recommendation.2. <br />3. Table for further information (specify). <br />4. Recommend denial. <br />5.Other.