My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-1998 Council Packet
Orono
>
City Council
>
1998
>
08-24-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:29:26 PM
Creation date
6/5/2024 3:24:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />// <br />To: <br />From: <br />Date: <br />Chair Smith and Orono Planning Commission Members <br />Ron Moorse, City Administrator <br />Michael P. Gaffron, Senior Planning Coordinator <br />August 14,1998 <br />Subject:#2404 Otten Brothers Nurser>', 2350 W. Wayzata Boulevard - Commercial Site Plan <br />Review (PUD-1) - Public Hearing <br />Zoning District: <br />Application: <br />B-6 (PUD-1), Highway Commercial District, Planned Unit Development <br />Request for commercial site plan approval for construction of a greenhouse <br />addition adjacent to the existing principal structure. <br />List of Exhibits <br />A - Application <br />B - Plat Map <br />C - Property Owners List <br />D - Survey (Existing) <br />E - Proposed Site Plan <br />F - Construction Plans/Elevation Views <br />G - Resolution No. 2692 (Sept. 1989) - Original Site Plan Concept Approval <br />H - Resolution No. 2794 (April 1990) - East Willow Woods Plat Approval <br />I - Original PUD Agreement & Attachments <br />J - B-6 Zoning Code <br />K - Code Sections re: Loading Berths <br />L - Originally Approved Site Plan <br />Summary of Request <br />Otten Brothers Nursery and Landscaping is preparing to construct a 132'x 144' greenhouse addition <br />at the east end of the main building. This greenhouse will cover a portion of the current open <br />area which is surrounded by an open canopy structure (see Exhibits D, E ^ <br />will be used for virtually the same retail sales function as currently exi^sts, p „nd the <br />controlled environment. No site grading is anticipated as part of the greenhouse project, and the <br />existing bituminous walkways will remain in place. <br />An existin' 40'x90' canopy section will be removed to allow greenhouse construcl.on, and this <br />«noTwm poLtially te relocated further north on the site. A revised survey tncluding the <br />propped location of this canopy section is expected to be submitted <br />Larina That survey is also expected to show the property boundaries correctly (the ^ubnimed <br />survey is incorrect, Ld will indicate the as-built location of a new retaimng wall' ^ <br />under construction (without the re.iuired land alteration permit and site plan approval) on the future <br />road corridor outlet. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.