My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-1998 Council Packet
Orono
>
City Council
>
1998
>
08-24-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:29:26 PM
Creation date
6/5/2024 3:24:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The total projected size of the forty-nine (49) tees is 65,000 square feet. The <br />estimated cost to build the tees is SI.44 per square foot or $93,600. <br />Bunkers <br />The bunker count for the project is sixty-three (63). In addition to shaping and <br />drainage (already covered), new Wgh quality sand will be installed. The estimated sand <br />needed for each bunker (average) is 30 cubic yards, or 45 tons (6” of non-conq)acted vdiite <br />bunker sand, 1,600 sq.ft, each bunker). At an estimated price of $50 per ton, the sand cost <br />for each bunker would be $2,250 or $141,750 total. To haul the sand to the bunker <br />locations and spread the sand in the bunker will cost approximately $500 per bunker or <br />$31,500. Therefore, the total cost for the feature construction portion of the bunkers is <br />estimated to be $173,250 <br />Based on these line hems, the total budget for feature construction (not including <br />optional greens) is $266,850. <br />IRRIGATION <br />A qualified irrigation designer has not reviewed the Master Plan in detail We have <br />included an allowance of $40,000 for this project until an e^qjert in irrigation design can <br />review the current system and make a study of the course changes. <br />CART PATHS <br />There will be a need to install approximately 1,140 lineal feet of new 8-foot wide <br />asphalt cart path- The estimated cost to core out a well, install 2 inches of asphalt over 4 <br />inches of gravel, and finish the edges once the paths are installed, is estimated to be $10 per <br />lineal foot or $11,400. There will also be 350 lineal feet of curbing at $3.00 per lineal foot. <br />The price for curbing is $1,050. The total cost for cart path and curbing is $12,450. <br />There will also be 350 lineal feet of the old path that must be removed- The cost for <br />this work is estimated to be $2 per lineal foot or $1,700. <br />The total estimated cost for cart paths is $14,150. <br />GRASSING <br />Sod <br />In order to get certain areas back in play as soon as possible sod should be used. It <br />is anticipated that aU areas will be sodded, including tees. Steeper slopes near bunkers or <br />tees should also be sodded. The total estimated amount of sod needed is 220,000 square <br />feet. The estimated cost is $.32 per square foot or $70,400 installed. <br />Hydroseeding <br />In places where sodding is not done, it is recommended that the area be <br />hydroseeded. There will be approximately 3 acres of hydroseeded surface an estimated <br />cost of $1,200 per acre for a total of $3,600. <br />Therefore, the total estimated budget for grassing is $74,000
The URL can be used to link to this page
Your browser does not support the video tag.