My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-1998 Council Packet
Orono
>
City Council
>
1998
>
08-10-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:08:01 PM
Creation date
6/5/2024 3:05:11 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E bert 23350 County Road 10 « P.O.Box 97 » Corcoran /Loretto,MN S5357CONSTRUCTION Phone(612)498-7844 « 1-800-627-1669 * Fax (612)498-9951PROPOSAL <br />Date: ]uly28, 1998 <br />To: Greg Gappa <br />City of Orono <br />2750 Kelley Parkway <br />Orono, MN <br />We hereby submit specifications and estimates for: Storm Damage Repair on 40' Section <br />of Building <br />• Remove and dispose of existing roofing, sheathing and trusses. <br />• Install new LVL header on sidewall. <br />• Install new trusses spaced at 24" on center with 40-7-10 loading at a 4:12 pitch. <br />• Install Certainteed Sealdon 25 shingles and asphalt felt on Vi” CDX sheathing. <br />• Install 12" "Rollex" soffit system on endwall and "Rollex" fascia system on endwall and <br />sidewall. <br />• Install 29 gauge Pro-Panel 11 steel on 80 LF of sidewall with necessary trim. <br />We hereby propose to fumLh material and labor - complete In accordance with above specIflcatJons, for the sum of: <br />Ten thousand seventy dollars ****************$10,070.00 ___ <br />Payment to be made as follows: 30% Downpayment, Balance Upon Completion <br />This proposal may be withdrawn by us If not accepted within 10 days. <br />Authorized signature <br />Ali material is guaranteed to be as specified. Ail work to be completed in a workmanlike manner according to <br />standard practices. Any alteration or deviation from above specifications Involving extra costs will be executed <br />only upon written orders, and will become an extra charge over and above the estimate. All agreements <br />contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary <br />insurance. Our workers are fully covered by Workers' Compensation Insurance. <br />Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby <br />accepted. You are authorized to do the work as specified. Payment will be made as outlined above. <br />Signature: <br />Signature: <br />CLfP-fc Cappa
The URL can be used to link to this page
Your browser does not support the video tag.