My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-27-1998 Council Packet
Orono
>
City Council
>
1950-2024
>
1997-1999
>
1998
>
07-27-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:11:59 PM
Creation date
6/5/2024 2:54:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
654
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
To the City Council and Citizens of the City of Orono <br />May 15. 1998 <br />The City Council has given conceptual approval to a joint project with Hennepin Parks to construct a <br />bike/hike trail on Old Ciystal Bay Road connecting two regional park facilities - the Luce Line Trail and <br />Baker Park. This trail will also serve the new City facilities and the Orono school campus. Funding for the <br />trail is to be shared between the City and Hennepin Parks. A substantial portion of the trail was completed <br />in 1997. The remainder is to be completed in 1998. <br />In response to the purchase of a residential lakeshore property by the Department of Natural Resources <br />(DNR) for a proposed public boat launch, Orono took action to cause the DNR to rethink its procedures <br />related to the provision of public access. Orono urged the DNR to take a wider and longer range view of this <br />issue to prevent a piecemeal approach to the provision of public access. In response, the DNR stopped all <br />activity related to the initial site and has purchased an existing marina for conversion to a public boat launch. <br />This new facility, completed in 1997, provides for public access needs without expanding commercial uses <br />on the lake and without forcing public boat launching facilities into the City ’s residential areas. This was <br />an outstanding example of a cooperative effort between two governmental jurisdictions to find a mutually <br />beneficial solution to a difficult problem. <br />Orono has worked in a cooperative effort with the cities of Long Uke and Medina and the Minnehaha Creek <br />Watershed District to accomplish a major water quality improvement project on Long Lake, a lake <br />contiguous to both the cities of Long Lake and Orono. This project was funded by the Minnehaha Creek <br />Watershed District. <br />A School Liaison Officer Program was initiated through a cooperative agreement with the school district. <br />Through this program a police officer works with school administrative and counseling staff, and builds <br />positive relationships with the students, to enable them to assist in addressing and preventing problems, and <br />to assist in intervening with "at risk" students. This program is fully funded by the school district. <br />The City is currently involved with a group of 14 cities located adjacent to Lake Minnetonka in an effort to <br />identify new opportunities for cooperative service delivery to enable improved services and increased <br />efficiency. <br />« « <br />* • <br />I ( <br />) t <br />Water and Sewer Fund Operations <br />The City continued its program to reduce the amount of ground water and stormwater entering the sanitary <br />sewer system, with the purpose of reducing sewage treatment costs. The program includes inspection of <br />manholes, lift stations, and sewer lines to identify significant sources of infiltration and inflow (I & I), then <br />sealing the manholes and lift stations, and repairing the sewer lines to eliminate the I & I. In 1996, the City <br />completed the inspection, sealing, and repair of sanitary sewer facilities in the initial project area. In 1997, <br />the City received a $ 10,000 grant from the Metropolitan Council Environmental Services to inspect a second <br />project area and a $ 17,000 loan to assist in funding the sealing and repairs needed in this area. These efforts <br />will result in substantial reductions in I & I, as well as reductions in the related sewage treatment costs. The <br />savings generated by these efforts will then be put toward addressing I & I problems in another project area. <br />This program will be ongoing. The City has now been awarded a second grant and loan for additional I & I <br />reduction efforts in 1998. <br />The City is planning a multi-year rehabilitation of the Navarre water plant. This project will address <br />maintenance and repair needs while upgrading the plant to meet projected water supply needs. The <br />rehabilitation plan will be guided by a comprehensive analysis of the water plant performed by the City ’s <br />consulting engineer. <br />-5-
The URL can be used to link to this page
Your browser does not support the video tag.