Laserfiche WebLink
APPENDIX A <br />ESTIMATED CONSTRUCTION COST FOR STREET IMPROVEMENTS <br />FERNDALE ROAD NORTH OF WAYZATA <br />CLEAR AND GRUB <br />LANDSCAPING <br />FRAFFIC CONTROL <br />RETAINING WALL <br />400 MM X 200 MM WET TAP <br />200 MM DIP WATER MAIN <br />REMOVE BITUMINOUS PAVEMENT <br />COMMON EXCAVATION <br />lOOmmPyC PERFORATED PIPE SUBDRAIN <br />GEOTEXTILE REINFORCEMENT FABRIC <br />GRANULAR SUBBASE <br />AGGR BASE. CL.5 100% CR ROCK 400 mm <br />rP 31 BIT. BASE COURSE. 75 mm THICK <br />rp 41 BIT. WEAR COURSE. 50 mm THICK <br />BITUMINOUS MATERIAL FOR TACK <br />B618 CONCRETE CURB & GUTTER <br />PAVEMENT MARKING <br />FURNISH & INSTALL SIGN PANELS <br />SODDING W/ 100 MM TOPSOIL <br />SiiPING W/ MULCH. FERTILIZER & TOPSOIL <br />Estimated construction c6st <br />LS. <br />LS. <br />LS. <br />LS. <br />S.M. <br />EA. <br />S.M. <br />C.M. <br />S.M. <br />C.M. <br />M. TON <br />M.TON <br />M.TON <br />S.M, <br />S.M. <br />COS <br />20,000.00 <br />20,000.00 <br />20,000.00 <br />10,000.00 <br />150.00 <br />2,000.00 <br />150.00 <br />3.00 <br />5.00 <br />20.00 <br />3.00 <br />11.00 <br />11.00 <br />32.00 <br />34.00 <br />1.00 <br />21.00 <br />0.80 <br />275.00 <br />3.50 <br />3000.00 <br />0.79 <br />0.79 <br />0.79 <br />0.79 <br />270 <br />9,700 <br />8,500 <br />17,100 <br />1,200 <br />17,400 <br />2,800 <br />1^00 <br />3,750 <br />2,850 <br />5,300 <br />10,200 <br />1 <br />15,800 <br />15,800 <br />15.800 <br />7,900 <br />40,500 <br />2.000 <br />750 <br />+5% CONTINGENCIES <br />+20% LEGAL, ENGINEERING AND ADMINISTRATION <br />TOTAL ESTIMATED COST <br />^100 <br />42.500 <br />1,500 <br />51,300 <br />13,200 <br />191,400 <br />89,800 <br />84,800 <br />3,750 <br />55,850 <br />4,240 <br />2,750 <br />35,700 <br />3,000 <br />$888,640^ <br />34,342 <br />$721,182 <br />144.238 <br />$865.418 <br />J