Laserfiche WebLink
fV Bonestroo Rosene <br />Andertik& <br />Associates <br />lEnoinctfs 4 AfChJtects <br />Project Name Edgewood Hills Sanitary Sewer l\v\f/ <br />Project No.File No. 13999 <br />Bid Opening 10:00 A.M., C.D.S.T., Friday, June 5,1998 Owner City of Orono <br />/ hereby certify that thb is an exact <br />reproduction of bids received. <br />BID TABULATION <br />Tabulation of Four Low Bids of Four Received <br />Glenn R. Cook, P.E. <br />Registration No. 09451 <br />\ <br />Bid No. 1 <br />G L Contracting <br />Bid No. 2 <br />Barbarossa & <br />Sons. Inc. <br />Bid No. 3 <br />Widmer, Inc. <br />Bid No. 4 <br />Burschville <br />Construction <br />No. Item Unit Qty. <br />Unit <br />Price Total <br />Unit <br />Price Total <br />Unit <br />Price Total <br />Unit <br />Price Total <br />Part 1 • Sanitary Sewer <br />1 8* PVC. SDR 35.8*- 10’ deep in place LF 45 20.40 918.00 46.00 2.070.00 50.87 2.289.15 40.00 1,800.00 <br />2 8" PVC, SDR 35. Iff-12 ’ deep in place LF 680 22.20 15.096.00 47.00 31.960.00 50.87 34.591.60 45.00 30,600.00 <br />3 8" PVC SDR 35.12'- 14’ deep in place LF 320 24.50 7.840.00 48.00 15360.00 53.31 17,059.20 50.00 16,000.00 <br />4 8* PVC SDR 35,14’-16' deep in place LF 230 27.50 6.325.00 49.00 11,270.00 56.58 13.013.40 55.00 12.650.00 <br />5 8* PVC SDR 35.16'-18* deep in place LF 300 31.40 9.420.00 50.00 15.000.00 61.14 18.342.00 60.00 18,000.00 <br />6 Constnict manhole over existing sewer EA 1 24.666.60 24.666.60 2.000.00 2.000.00 1362.31 1.562.31 5,000.00 5,000.00 <br />7 Connect 8* PVC to existing manhole EA 1 2.057.70 2.057.70 1.000.00 1.000.00 980.03 980.03 5.000.00 5,000.00 <br />8 SuLMH8*dp.,4*dia.,w/R1642Bcstg.EA 12 1.552.40 18.628.80 1,700.00 20.400.00 2,004.64 24,055.68 2,500.00 30,000.00 <br />9 MH depth greater than 8* deep LF 68 124.60 8.472.80 100.00 6.800.00 96.85 6385.80 150.00 10.200.00 <br />10 Qean out manhole as per detail EA 1 1.867.40 1,867.40 1,800.00 1,800.00 2.144.58 2,144.58 2,000.00 2.000.00 <br />11 Directional bore 8-HOPE SDR 17 LF 1.290 47.50 61.275.00 61.00 78.690.00 86.11 111,081.90 100.00 129,000.00 <br />12 3" HDPE» SDR 11, trenched In place LF 810 13.10 10.611.00 25.00 20.250.00 18.44 14,936.40 40.00 32.400.00 <br />13 Directional bore 4” HDPE SDR 11 service pipe LF 1.300 40.00 52.000.00 45.00 58300.00 54.15 70395.00 78.00 101,400.00 <br />14 Connect 3" HDPE to manhole os per detail EA 1 523.00 523.00 1.000.00 1.000.00 795.44 795.44 2.000.00 2,000.00 <br />15 4-PVC cleanout EA 10 95.20 952.00 500.00 5.000.00 930.15 9.301.50 500.00 5,000.00 <br />16 l*l/2 ” curb stop & box. installed as per detail LF 5 190.30 951.50 500.00 2.500.00 94.84 474.20 250.00 1,250.00 <br />17 3" X 3-HDPE tee EA 5 55.30 276.50 100.00 500.00 25.58 127.90 150.00 750.00 <br />18 3*x 1-1/2" HDPE reducer EA 5 36.80 184.00 100.00 500.00 18.07 90.35 150.00 750.00 <br />19 1-1/2-HDPE. SDR 11 LF 200 10.70 2.140.00 20.00 4.000.00 11.06 2.212.00 20.00 4,000.00 <br />20 8" X 4" PVC or HDPE compatible service <br />wye branch EA 20 168.00 3.360.00 1.000.00 20.000.00 145.31 2.906.20 1.750.00 35.000.00 <br />21 Furnish 8" x 4" PVC wye. cut into ex. 8" PVC EA 2 1.115.30 2.230.60 1.000.00 2.000.00 145.31 290.62 500.00 1,000.00 <br />22 4" PVC service pipe in pbee, SDR 26 LF 500 13.50 6.750.00 35.00 17.500.00 24.42 12.210.00 12.00 6.000.00 <br />n <br />13999i>t BT-I