My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-1998 Council Packet
Orono
>
City Council
>
1998
>
06-08-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 2:28:34 PM
Creation date
6/5/2024 2:19:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9. <br />the east boundary and additional area near the intersection of North Arm Lane <br />and North Arm Drive West, as shown in the sketch attached to this resolution <br />as Exhibit A. Additionally, to potentially accommodate a future cul-de-sac at the <br />current terminus of North Arm Lane, applicant will be required to grant a road <br />and utility easement for a portion of a cul-de-sac within the northeast comer of <br />Lot 1, such easement subject to potential vacation or extinguishment should a <br />cul-de-sac at some future date no longer be required due to the northward <br />extension of North Arm Lane or other factors, at the discretion of the City. <br />Applicant will be required to provide drainage calculations to determine whether <br />stormwater management facilities will be required. Applicant will also be <br />required to obtain the approprite permits from the Minnehaha Creek Watershed <br />District. <br />The Orono Park Commission has recommended that no additional right-of-way <br />or trail easements are required from this developer since any future trail needs <br />can be accommodated within the existing right of way. <br />NOW, THEREFORE, BE IT RESOLVED, that based upon one or more of <br />the findings noted above, the City Council of the City of Orono hereby approves the <br />preliminary plat application of Barry and Janiece Haglund per preliminary plat drawings by <br />Mark S. Gronberg, a licensed surveyor of Coffin & Gronberg, Inc, dated April 22, 1998, <br />subject to the following conditions: <br />1. <br />2. <br />Applicant shall dedicate on the 33' of public right-of-way for North Arm <br />Drive West per the above-referenced preliminary plat drawing. Additionally, <br />applicant shall dedicate public right-of-way for North Arm Lane on the plat as <br />depicted in Exhibit A attached. <br />Applicant shall provide to the City evidence of an access easement in favor of <br />applicant's property over the 33' privately o\\Tied corridor adjacent to the east side <br />of the property. <br />Lot 2 shall continue to access to North Arm Drive West via the e.xisting private <br />driveway. Lot 1 shall directly access North Arm Lane via a private driveway as <br />Page 3 of7
The URL can be used to link to this page
Your browser does not support the video tag.