My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-26-1998 Council Packet
Orono
>
City Council
>
1998
>
05-26-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 2:21:33 PM
Creation date
6/5/2024 2:15:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />P.O. Box 66 <br />Crystal Bay, MN 55323 <br />473-7357 <br />ZONING FILE #2355 <br />NOTICE OF PLANNING COMMISSION <br />ACTION <br />DATE OF NOTICE; April 29, 1998 <br />TO: Susan & Douglas Van Moorlehem COPIES TO: <br />4490 Watertown Road <br />Maple Plain, MN 55359 <br />Ken Tumham <br />4501 Shoreline Dr., Apt. 231 <br />Spring Park, MN 55384 <br />TYPE OF APPLICATION:Subdivision <br />DATE OF MEETING: 4/20/98 VOTE:6 FOR 0 AGAINST <br />• •% . • <br />Planning Commission recommends the following: <br />Approval subject to conditions noted below. <br />NOTES AND SPECIAL CONDITIONS: <br />1. Applicant to confirm drv buildable acreage of Lot 1. Block 1 prior to Council preliminary <br />plat review: Planning Commission determined that if it is confirmed that it's under 5 acres, <br />a variance would be appropriate. <br />2.Lots 1 and 2. Block 3 should be platted as a single 6-acre lot, reflecting the Countv right-of- <br />wav acquisition. The preliminary plat drawing must be revised prior to Council preliminary <br />plat review. <br />3. New driveway access locations will be subject to Public Services Director approval. <br />4. Applicant to provide pre- and post-development drainage calculations per City Engineer <br />comments prior to Council preliminary plat review. <br />5. Park dedication (fee vs. land) to be reviewed by Park Commission on May 4. Applicants are <br />welcome to attend. The meeting begins at 7:15 p.m. in the Council Chambers. <br />6. Standard plat conditions: <br />a. Granting of standard perimeter drainage and utility easements <br />b. Granting of Conservation and Flowage Easement over City protected wetland in Lot <br />1, Block 1. <br />c. Creation of covenant for protection of non-City protected wetland in Lof f, Block 2. <br />Applicant’s next scheduled meeting is dependent upon receipt of the information underlined above. <br />Deadline for the May 11 meeting is Monday, May 4, or Monday May 18 for the May 26 meeting. <br />If the applicant has trouble obtaining the additional information requested, please contact the Zoning <br />Department (473-7357). <br />If you desire certified copies of the official Planning Commission minutes, they are available from <br />the City Recorder after review and approval by the Planning Commission. <br />X:\APPS\\VP\VIN60\WPDOCS\CAROLEVPCACnON\2355
The URL can be used to link to this page
Your browser does not support the video tag.