My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-11-1998 Council Packet
Orono
>
City Council
>
1998
>
05-11-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 2:00:54 PM
Creation date
6/5/2024 1:58:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />7. <br />(t>>- Erosion Control Plon. <br />(b ©) A maintenance agreement shall be submined for: stormwater treatment ponds, outlet <br />structures for such ponds, culverts, outfall structures, and all other stormwater facilities. The <br />maintenance agreement shall specify the methods, schedule and responsible parties for maintenance <br />and must include at a minimum, the elements contained in the District’s Maintenance Agreement <br />Form. A Maintenance Agreement Form will be provided to the applicant for use by the applicant as <br />a maintenance agreement or as guidance if the applicant desires to draft a separate maintenance <br />agreement. The maintenance agreement must be recorded with the county within 10 days of the <br />issuance date of the permit. <br />(dc) Geotechnical soil boring results if available. <br />EXCEPTIONS. <br />(a) If the District has approved a municipal stormwater management plan for a municipality, or for <br />a subwatershed within a municipality, the requirements in purogroph 3 of this rule whioh are not met <br />by the munioipol plan shall mav be deemed satisfied upon showing of compliance by an individual <br />developer with the municipal plan. <br />(b) The requirement of paragraph 3(a) abov»s ha>l not apply to a projeet w here the-total site area is <br />tess-thoB-one- half aore. <br />(o)-Residentiol dev elopments where the total site area is less than ^v^►Qor e5 and oontoins four or <br />fewer liv ing units, and where the total off site area contributing runoff to the-site improv ements in <br />less than one oore, do-no< require a permit under this rule.- Approv ed-erosion control measures must <br />be properly installed, howev er, and maintoined throughout the eonstruotion process and until all <br />disturbed areos are fully stabilized. <br />(b) The water quantity requirements of this rule will be waived upon a determination bv the Board <br />of Managers that a downstream facilitvfiesl is in place or has been ordered and the facilitvfies) is <br />designed with adequate capacity to limit the peak runoff rate from the subwatershed under fullv <br />developed conditions. The water quantity requirements of this rule mav also be waived upon a <br />determination bv the Board of Managers that the time of concentration of the downstream receiving <br />water body is sufficiently long such that limiting the peak rate of runoff from the project has either <br />no practical effect or an adverse effect. <br />c> The water quality requirements of this rule will be waived upon a determination bv the Board of <br />Managers that a downstream facilitvfiesi is in place or has been ordered and the facilityfiesl is <br />designed to remove at least 50% of the total phosphorus from runoff entering the facility from the <br />subwatershed under fullv developed conditions. <br />Draft • April 29,1998 <br />1
The URL can be used to link to this page
Your browser does not support the video tag.