My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-1998 Council Packet
Orono
>
City Council
>
1998
>
03-09-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 1:59:00 PM
Creation date
6/5/2024 1:53:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
\ <br />\ <br />/ <br />/ <br />/ <br />\ • <br />y ## <br />( <br />■ \ <br />r> <br />JL <br />0 <br />/ <br />U m Bonestroo <br />Rosene <br />Anderlik & <br />Ivll Associates <br />Engineers & Architects <br />January 12, 1998 <br />Bonestroo. Rosene. Anderhk t^nd AssocuUes. Inc is an Affirm.itive Action Bqu^l Opportunity Employe <br />Principals Otto G Bonestroo. P£ • Joseph C Anderlik PE • M.irvin L Sorv.il.^ PE • <br />Richard E Turner. PE • Glenn R Cook. PE • Robert G Schun/cht. PE • Jerry A Bourdon. PE • <br />Robert W Rosene. PE and Susan M Ebcrim. C PA . Senior Consultants <br />Assocuite Pnncip.iis Howard A. Saniord. PE • Keith A Gordon. PE • Robert R Pfefferfe. PE • <br />Richard W Foster. PE • David O Loskota. PE • Robert C Russek. A 1 A • Mark A Hanson. PE • <br />Michael T Rautmann. PE • Ted K Field. PE • Kenneth P Anderson. PE • Mark R Rolfs. PE • <br />Sidney P Williamson. PE . L S • Robe-t F Kotsmcn <br />Offices St Paul. Rochester. Willmar and St Cloud MN • Milwaukee. Wl <br />Mr. Michael P. Gaffron <br />Senior Planning Coordinator <br />City of Orono <br />Post Office Bo.x 66 <br />Crystal Bay. MN 55323 <br />Re:Andersen Subdivision <br />File No. 139-2321 <br />Dear Mike: <br />We have reviewed the sketch plan for the proposed eight lot Andersen subdivision. The site is located west of Old <br />Crystal Bay Road South (C.R. 84) in the northwest quarter of Section 9. We have the following comments in regards <br />to engineering mailers. <br />1. Access: Access to Lot 8 is unclear. We would recommend moving Outlet B approximately 150 feet souti.cast to <br />provide access to Lot 8 and eliminate private driveways onto C.R. 84. How will future access be provided to the <br />Lots immediately west of the site? Will the existing buildings on Lots 1. 2,4 and 5 remain or be removed? The <br />existing grades on Outlot A exceed 10 percent. City code allows up to a 12 percent grade on private streets, <br />however, we would recommend that grades not exceed 2 percent for the first 50 feet off of C.R. 84. It does not <br />appear that adequate sight distances exist for either cul-de-sac. Plans should be submitted to Hennepin County for <br />their review. <br />2. Grading: A grading and erosion control plan for the entire site should be submitted for review. Erosion control <br />measures should be in place prior to any grading, particularly along the lakeshore. Additional erosion control will <br />be needed during construction of the houses and septic systems. <br />3. Drainage: The draft version of the City’s’ Comprehensive Storm Water Management Plan (SWMP) shows that the <br />site lies within two major drainage districts, half draining easterly and half draining southwesterly. We recommend <br />that storm sewer be included as part the project to direct flows in accordance with the SWMP. The final plans <br />should include a storm water quality pond to treat runoff prior to discharging into the lake. A drainage area map. <br />storm sewer and ponding calculations should be provided with the final plan set. <br />4. Easements: Final platting should include 33 feet of dedicated right-of-way for C.R. 84. Drainage and utility <br />easements should be provided 5 feet wide along all interior lot lines and 10 feet wide along the roadway right-of- <br />ways. Drainage easements should be provided across all wetland, drainage way and pond areas. <br />5. Financial Guarantee: When the plans have been completed we will prepare an estimate of the total cost for the site <br />improvements to determine the amount of the financial guarantee required. <br />Please contact me at (604-4863) if you have any questions regarding this matter. <br />Yours very truly, <br />BONESTROO. ROSENE. ANDERLIK & ASSOCIATES. INC. <br />/cry*^ <br />Tom Kellogg <br />Cc: Greg Gappa, City of Orono <br />233S West Highway 36 • St. Paul, MN 5SII3 ■ 612-636-4600 ■ Fax: 6)2-636-1311
The URL can be used to link to this page
Your browser does not support the video tag.