My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-1998 Council Packet
Orono
>
City Council
>
1998
>
03-09-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 1:59:00 PM
Creation date
6/5/2024 1:53:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BONESTROO AND ASSOCIATES ^ 612 6361311 02/12/98 12:59 0 :04/04 NO:957 <br />CITY OF ORONO <br />LITTLE ORCHARD <br />RESIDENTIAL SITE DEVELOPMENT <br />PLAT FILE NO. 2341 <br />SITE IMPROVEMENT COST ESTIMATE <br />ITEM UNIT <br />EST. <br />QUANTITY <br />UNIT <br />PRICE <br />EST. <br />COST <br />Mobilization LS 1 $5,000.00 $5,000 <br />Site grading LS 1 10,000.00 10,000 <br />Common Excavation CY 1200 6.00 7,200 <br />Aggregate base. Cl. 5, 100% crushed TN 1800 10.00 18,000 <br />Type 31 bit. base course TN 250 32.00 8,000 <br />Type 41 bit. wear course TN 200 35.00 7,000 <br />Surmountable concrete curb and gutter LF 1350 6.00 8,100 <br />18" CMP culvert LF 50 18.00 900 <br />18"CMPF.E.S.EA 2 150.00 300 <br />Silt fence LF 1500 300 4,500 <br />Seeding with 4" topsoil AC 1.5 3.000.00 4,500 <br />Sod with 4" topsoil SY 1600 3.00 4,800 <br />Estimated Construction Cost <br />+50% Security Deposit <br />Total Security Deposit Required <br />$78,300 <br />39,150 <br />$117,450 <br />2341littldorchard xls
The URL can be used to link to this page
Your browser does not support the video tag.