My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-1998 Council Packet
Orono
>
City Council
>
1998
>
03-09-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 1:59:00 PM
Creation date
6/5/2024 1:53:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
File #2341 <br />February 12, 1998 <br />Page 5 <br />Septic Testing and Site Availability <br />Steve Weekman has confirmed that all lots have viable primary and alternate sites, and that future <br />testing would be needed to confirm whether less costly trench systems can be used on certain sites <br />where mounds are now acceptable. <br />Bluff Impacts <br />Lots 5 and 6 contain a bluff, and the 'top of bluff was defined by stall during the sketch plan review. <br />A 30' setback from top of bluff is required for any structures, and fill or excavated material is not <br />allowed to be placed within the bluff impact zone. <br />The top of blufl'as depicted in the preliminary plat for Lot 5 does not match the top of bluff location <br />identified by staff, and top of bluff actually is vcia ' near the proposed house location on Lot 5. Lot <br />5 has a very restrictive building site due to the street setback and top of bluff setback requirements. <br />A more thorough analysis of the allowable building site should be considered for Lot 5, since that <br />lot appears to be the least flexible of the lots in regards to house placement. <br />Tree and Woodland Impacts: Eusement Proposed <br />Tree lines and wooded areas are shown on the topographic background map (See Exhibit 1 of Sketch <br />Plan memo). Most of the wooded areas are near the shoreline or along the west property boundary. <br />The dense woods along the shoreline will be under tremendous pressure. We could expect that <br />individual homeowners will want to establish views of the lake from their new homes, by thinning <br />the woods or creating open corridors to the lake. Such changes in the nature of the shoreline <br />landscape would be unfortunate in the context oftliis virtually untouched arm of Maxwell Bay. <br />ITie tree preservation ordinances currently in place would disallow cutting any 6" or larger diameter <br />tree within 75' of the shoreline, and prohibit 'intensive vegetation clearing' within 75' of the <br />shoreline, on steep slopes and in the bluff impact zone. <br />During the sketch plan review. Planning Commission agreed that it would be appropriate to require <br />that some type of 'tree consen ation ea.sement’ be specifically developed for this site. This would <br />appear to be possible under the provisions of Section 11.60, Subd. 1. The developer should also be <br />required to plant boulevard trees along all roads per the subdivision code requirements. <br />Issues for Discussion <br />1. Will Planning Commis.<:ion accept the two cul-de-sac lots which require width variances?
The URL can be used to link to this page
Your browser does not support the video tag.