f <br />r <br />i > <br />HM <br />I t <br />I <br />r <br />%u- <br />• . <br />• ' <br />t <br />«« <br />U <br />The Cities of Plymouth and Orono will need to review the three street width options. Both <br />cities should then come to an agreement on street width prior to ordering plans and <br />specillcations. It should be noted that the three proposed street widths do not vary <br />significantly in terms of their impacts to adjacent properties. <br />Street Design <br />The criteria for the roadway designs are ba.sed on Mn/DOT State Aid standards. The <br />propo.sed design .speed for Femdale Road is 30 miles per hour (mph). The proposed <br />pavement section for Femdale Road, which is based on the anticipated traffic volumes over <br />the next 20 years, is presented below: <br />50mm (2”) Type 41 bituminous wearing course <br />75mm (3") Type 31 bituminous base course <br />400mm (16 ”) Aggregate base. Class 5,100% crushed rock <br />Soil borings have been taken along the project that show the presence of some organic <br />materials. Organics encountered in the subgrade will be excavated and replaced with a <br />suitable clay or granular material. The street section will be reinforced with a geotextile <br />stabilization fabric that will also provide separation between the subgrade and the aggregate <br />base. <br />Water Main <br />An existing water main stub located near Femdale Green on the south end of the project <br />would be extended southerly off of the roadway as part of the street construction. The <br />extension would allow for a future water main connection to the City of Wayzata without <br />disturbing Femdale Road. A 200 mm stub would be provided on the east side of Femdale <br />Road approximately 100 meters north of Twelfth Avenue to serve any future Plymouth <br />development. <br />Storm Drainage <br />As part of the street reconstruction on Femdale Road, stomi sewer is proposed to be <br />constructed to improve the drainage along the street. Storm sewer would be in.stalled at the <br />five low points on the roadway. Storm drainage would be directed southerly and easterly to <br />existing ponding areas and wetlands. The cities of Medina. Plymouth iuid Orono with the <br />Minnehaha Creek Watershed Distriet (MCWD) are currently working towards solving a <br />high water level problem in Mooney Lake located just north of County Road 6 at Femdale <br />Road. A possible solution to reduce the water level in Mooney Lake is to provide off-peak <br />pumping from the lake to the Femdale system. The stomi sewer on the north end of the <br />project has been sized to accommodate 1 cubic fool per second (cfs) of .stormwater should <br />Plymouth Feasibility Report - Femdale Road Reconstruction