My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-1998 Council Packet
Orono
>
City Council
>
1998
>
04-13-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 1:54:18 PM
Creation date
6/5/2024 1:50:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
354
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINIMUM MATERIAL REQUIRED FOR COMPLETE PRELIMINARY APPLICATION <br />1. Pa>'ment of fees (refer to "application fees" listed below. <br />2. Completed application form. <br />3. Preliminary plat information on Certificate of Survey. <br />4. Certified Property Owners List of owners within 350' (you must obtain this list from Hennepin County Department of Finance A-603 <br />Govt. Center 348-3271). <br />5. As an addendum to this application, please attach a separate list of any other persons you wish notified of this application. <br />Zoning OfTicial's Signature_______________________________________ Date—____------------------------------------ <br />MINIMUM MATERIAL REQUIRED FOR COMPLETE FINAL APPLICATION <br />1. Payment of fees (refer to Preliminary Subdivision Approval resolution and park fees if appicable). <br />2. Signed Certificate of Survey or mylar copies of formal plat. <br />3. Title opinion. <br />4. Easements, covenants, etc. <br />5. Developers Agreement and Letter of Credit. <br />Zoning Official's Signature_________________________________________Date <br />I. APPLICATION FEES (Zoning Administrator to check [X] those which apply) <br />A. Application Base Fees: <br />______ Sketch Plan Review (Class 1,11 & 111) $250.00 <br />______ Subdivision of a Lot Line Rearrangement $350.00 <br />______ Subdivision Application (Class 1 & 11) $350.00 <br />Preliminary Subdivision Application $375.00 + $25.00/lot (Class 111 & all non-residential) <br />Final Plat Application (Class 111) $200.00 <br />______Legal Review and Filing: <br />_____Subdivision only $75.00 <br />_____Subdivision w/easements and covenants min. $200.00 <br />_____ Park Fees (to be detemiined per Section 11.62) <br />Legal and Engineering Review Fees (as incurred) <br />______Renewal of Class 1 and II Subdivision Application $200.00 (No change from original application) <br />Renewal of Class 111, Preliminary Subdivision Application $200.00 (No change from original application) <br />Renewal of Final Class 111 Subdivision Application $150.00 (No change from original application) <br />Totals <br />lin. ft. X .50 = $ <br />lin. ft. x.50 = $ <br />B. Special Improvement Fees: <br />______ Proposed Private Roads S600.00 + $.50/lineal ft.; <br />_____ Proposed Public Roads $900.00 + $.50/lineal ft.; <br />______ Request for City to Accept Existing Private Road $900.00 <br />______ Proposed Sanitary Sewer Main Extension $250.00 + $25/stub <br />_____ Proposed Watermain Extension $250.00 + $25/stub <br />______ Proposed Storm Sewer System (excluding culverts) $200.00 <br />______ On-Site System, Site Evaluation Review (applicable to rural subdivision applications) <br />S50.00/per lot x_____new lots <br />C. Flexible Application Fecs/Misc. Fees <br />_____ Variance $220.00 ($50.00 per each additional variance) <br />_____ Easement Vacation Associated with Subdivision SI00.00 <br />_____ PRD Application with Subdivision $30.00/Dwelling Unit <br />The applicant hereby agrees to provide all infomiation required or requested by the Zoning Administrator, City Engineer, City Attorney, <br />Planning Commission and Council necessary to process this application and^rther agrees to pay all additional fees established by <br />ordinance. o ^ <br />lA'jApplicant's Signature V^-<r Date ^-----7— <br />Owner’s Signature <br />A <br />^ Date i <br />Applicant must haveCtt lubminals into the City Office 25 da^^ before the Planning Commission meeting. Planning Commission meetings <br />are held on the third Monday of each month. Applicants must be present at all scheduled review meetings of the Planning Comrnission <br />and Council. If an applicant is unable to attend a scheduled meeting, please make arrangements to have an authorized agent attend in your <br />nlace and to advise the Buildine Zoning Office of this change prior to the meeting
The URL can be used to link to this page
Your browser does not support the video tag.