Laserfiche WebLink
#2341 - Dan Anderson <br />March 20,1998 <br />Page 2 <br />Lot width variances req <br />Private road horizontal cun-.; radius variance <br />60-day review period extension. <br />uired for Lots 2 & 3 on the cul-de-sac are acceptable. <br />from 275' to 125' is acceptable. <br />by the applicant ’s engineer. <br />Lot Layout Issues - Lot 7 <br />M noted in the March 6 memo, the City does nm credit St— <br />provided a revised plan (E^ibit A) ^ <br />than the road outlot extending p • <br />. 1- at the n-iva*-- oad but needing a lot width <br />the as yet easement.this layout contains 2.0 acres exclusive r <br />. , v cites and 1. ‘ • -y inflexible) house site meeting <br />iS“d docs not e^rge'i'n shape or s..c <br />Trail Easement Discussion e March 1 8 regarding trail location and <br />Please review City Engineer Tom taken from the <br />construction issues, he is Read. .Mignment of such a trail will be