My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-1998 Council Packet
Orono
>
City Council
>
1998
>
04-13-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 1:54:18 PM
Creation date
6/5/2024 1:50:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
354
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#2341 - Dan Anderson <br />March 20,1998 <br />Page 2 <br />Lot width variances req <br />Private road horizontal cun-.; radius variance <br />60-day review period extension. <br />uired for Lots 2 & 3 on the cul-de-sac are acceptable. <br />from 275' to 125' is acceptable. <br />by the applicant ’s engineer. <br />Lot Layout Issues - Lot 7 <br />M noted in the March 6 memo, the City does nm credit St— <br />provided a revised plan (E^ibit A) ^ <br />than the road outlot extending p • <br />. 1- at the n-iva*-- oad but needing a lot width <br />the as yet easement.this layout contains 2.0 acres exclusive r <br />. , v cites and 1. ‘ • -y inflexible) house site meeting <br />iS“d docs not e^rge'i'n shape or s..c <br />Trail Easement Discussion e March 1 8 regarding trail location and <br />Please review City Engineer Tom taken from the <br />construction issues, he is Read. .Mignment of such a trail will be
The URL can be used to link to this page
Your browser does not support the video tag.