My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-1998 Council Packet
Orono
>
City Council
>
1998
>
04-13-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 1:54:18 PM
Creation date
6/5/2024 1:50:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
354
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />Memo <br />l/]l Boncstfoo <br />Rosene <br />vS Andeiiik & <br />|\j| Associates <br />lAgrwrt 4 Ar«fwi #<t i <br />Water Quantity <br />The topography of this site prevents the entire site to drain to a single ponding area. <br />We offer the following recommendations; <br />1 It is recommended that impervious surfaces, (house, driveway, and yard) and any land d's^rbed <br />during construction be routed to drain into the street and into the proposed ponding area. This will <br />reduce the amount of untreated runoff draining directly to the lake. <br />2 The installation of an Emergency Over Flow (E.O.F.) is recommended at the intersection of Outlot A <br />and Old Crystal Bay Road. The E.O.F shall direct the runoff not captured during large storm events <br />to flow overland to the pond instead of out onto Old Crystal Bay Road South. A swale should be <br />graded along the proposed 15-inch RCP pipe system into the proposed pond. <br />3 A stilling basin lined with rip-rap should be installed between the outlet and the pond to prevent <br />erosion from the high velocities discharging from the 15-inch pipe. A 1-2 ft berm should separate <br />the stilling basin from the pond. The stilling basin should be 15 feet in length with 4:1 side slopes. <br />The stilling basin may not be required if outlet velocities are reduced to 5 fps using some other <br />method. A design in detail should be submitted. <br />4. Our calculations show a 100-yr HWL of 942.0’, which includes the overland drainage litm V <br />and VI. This HWL seems to provide sufficient freeboard even though the buiiding elevation on Lot 7 <br />is not shown on the plan. <br />5. The ponding calculations for pre- and post-development for the 5.10. and 100-year storm events <br />should be submitted. <br />6. The outlet from the pond should be directed easterly under Old Crystal Bay Road to the existing <br />ponding area. A design detail should be submitted. <br />7 A berm at an elevation of 943.5’ should be installed around the pond. An E.O.F. set at 942.5 ’ <br />■ should be located on the south east corner of the pond, to allow outflow during storm events larger <br />than the 100-year storm event. The pond E.O.F. should direct the *f>>e;gejhto the west ditch^^^^^ <br />along Old Crystal Bay Road South. The 15-ft. wide E.O.F should be lined either with np-rap or well <br />established vegetation. <br />8. It is difficult to determine from the grading plan whether a maintenance hen^=hjs being provided <br />above the pond NWL. At a minimum, there should be one provided around the inlet and outlet <br />well as any point where dredging operations might occur. <br />9 The ponding area should have a 10:1 aquatic bench at the ponds NWL. The ponding area <br />illustrated on the plans submitted on March 15“’ does not appear to have this bench. <br />Bonestroo, Rosene, Anderlik and Associates------------------------------------------- <br />2335 West Highway 36 ■ SI Paul. MN 55113 ■ Phone. 612-636-4600 ■ Fax:612-636-1311
The URL can be used to link to this page
Your browser does not support the video tag.