My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-1998 Council Packet
Orono
>
City Council
>
1998
>
02-23-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 1:18:02 PM
Creation date
6/5/2024 1:10:14 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON JANUARY 20, 1998 <br />(#18 - #2327 Orono Development - Continued) <br />Gafifron said he would recommend that limitations be placed on the use as a separate line. <br />The limitations would need to be developed. He has been given some suggestions from <br />Shardlow, which is currently not reflected in the proposed language. Lindquist and Smith <br />said they would like to review the language when drafted. Schroeder felt satisfied with <br />staff handling the matter. Lindquist agreed to let staff develop the details and send it <br />forward to the Council for review. <br />Vote: Ayes 4, Nays 1, Hawn. <br />Council will review the application at their February 24 meeting. <br />Commercial Site Plan Review and Variances <br />(#19) #2326 ORONO DEVELOPMENT, LLC, 2380 SHADYWOOD ROAD - <br />Variances for hardcover and front yard parking setback and a commercial site plan <br />review to construct an 11,000 sq. ft. retail/service center building' 12:03-1:00 a.m. <br />The Certificate of Mailing and Affidavit of Publication were noted. <br />The Applicants were present. <br />Gaffion reported that the application is a commercial site plan review and variance <br />approval for the multi-retail building noted in agenda item #18. Variances include 500- <br />1000' zone hardcover and parking setback from street. The property is 1.86 acre site. <br />Gaffion noted the property as it exists today and with proposed improvements for a bank <br />buildmg and retail sales. A portion of Navarre Lane was vacated last year. The site <br />contains stormwater management ponding serving the Culver site. <br />Gaffion reviewed the application with regards to conformity with performance standards <br />of the B-5 District as laid out in the information packet. He noted that the building layout <br />is similar to what has previously been shown. Gaffion reported that the hardcover is less <br />than what is seen elsewhere in Navarre. There will be building space for 6-8 tenants. <br />Inside floor plans are not yet available. The permitted and conditional uses are in <br />conformance as are lot area and lot width. The front yard setback requirement is 20' <br />nunimum and proposed at 5*. The landscape architect lias commented that more space <br />should be provided for plantings. A 20' rear setback is required for the through lot but <br />proposed at 14'. Entrance monuments are also being proposed.
The URL can be used to link to this page
Your browser does not support the video tag.