Laserfiche WebLink
r <br />I <br />I L <br />CITY OF ORONO <br />ORONO DEVELOPMENT, L.LC. <br />COMMERCIAL SITE DEVELOPMENT <br />PLAT FILE NO. 2327 <br />ITEM <br />Mobilization <br />Site grading <br />Pond excavation <br />Stabilization fabric <br />Aggregate base, Cl. 5,100% crushed <br />Type 31 bit. base course <br />Type 41 bit. wear course <br />B618 concrete curb and gutter <br />12“ RCP storm sewer <br />15“ RCP storm sewer <br />12“ F.E.S. <br />Std. storm sewer manhole <br />Std. catch basin manhole <br />Std. 2' X 3' catch basin <br />Rip rap <br />Silt fence <br />Retaining wall <br />Seeding with 4" topsoil <br />Sod with 4“ topsoil ________ <br />Estimated Construction Cost <br />+50% Security Deposit <br />Total Security Deposit Required <br />Orono Development. L.L.C. <br />LS <br />SY <br />TN <br />TN <br />TN <br />LF <br />LF <br />LF <br />EA <br />EA <br />EA <br />EA <br />CY <br />LF <br />SF <br />AC <br />SY <br />EST. <br />QUANTITY <br />1 <br />1 <br />1 <br />4050 <br />3100 <br />500 <br />450 <br />1850 <br />240 <br />180 <br />- -----Y r ; Vj <br />1 <br />1 <br />500 <br />1440 <br />0.3 <br />2000 <br />UNIT <br />PRICE <br />$10,000.00 <br />$20,000.00 <br />10,000.00 <br />1.00 <br />10.00 <br />32.00 <br />35.00 <br />6.00 <br />25.00 <br />30.00 <br />500.00 <br />2,500.00 <br />2,000.00 <br />1,000.00 <br />50.00 <br />3.00 <br />15.00 <br />3,000.00 <br />3.00 <br />EST. <br />COST <br />$10,000 <br />$20,000 <br />10,000 <br />4,050 <br />31.000 <br />16.000 <br />15,750 <br />11,100 <br />6,000 <br />5,400 <br />500 <br />5.000 <br />2.000 <br />2,000 <br />300 <br />1,500 <br />21,600 <br />900 <br />6,000 <br />$169,100 <br />84,550 <br />$253,650