My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-1998 Council Packet
Orono
>
City Council
>
1998
>
02-23-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 1:18:02 PM
Creation date
6/5/2024 1:10:14 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON FEBRUARY % 1998 <br />(Ul - Edgewood Hills Improvement Project - Continued) <br />Jabbour asked if the home orientations were positive in relation to the sewer location. <br />Kellogg said that in most cases the sewer line comes out to the back or to one side of the <br />residence. <br />Kellogg reported that the cost for the directionally bored option within 20' of the service <br />results in an assessment of $21,140 for each of the 8 properties. <br />Jabbour noted that a separate assessment hearing would be scheduled. Cusick asked <br />about finance plans. Jabbour indicated that the City’s high bond rating allows for the City <br />to receive a good interest rate. He did note that the project would be included with <br />another project to keep costs down. There are some administrative costs involved. The <br />assessments would be paid over a 15 year period. Goetten noted that the cost could also <br />be paid upfront if the residents so choose. <br />Jm Nielson, 340 North Arm Lane, asked if there would be any problem in transitioning <br />the additional lift to the roadway from the driveways. Kellogg said the 1-1/2" lift would <br />be tr^sitioned back on the driveway and would be smooth. Kellogg informed Nielson <br />that the hole dug for the sewer would be 16-18' deep. Nielson asked if the lower level <br />wodd bTsered"^ basements <br />"If 'he proposal is for a <br />hV ■"‘‘■ea'ed that the project is ahead of sch^ule at this <br />lime but another project may affect the construction outcome. Jabbour noted that <br />"“f O' effect the lime frame. <br />Slmtr hat the assessment hearing would allow the public to comment <br />about any problems they may have with the project. <br />heering would be held after bids and <br />^ifications are completed, bids are advertised and received. Kellogg thought the <br />tomg would occur m May or June. Gappa indicated that there is aTo-day tailing <br />can be eXilSSt ta”' <br />fccttrhoZ'f" “ 'T over <br />. dunng the construction period. Goetten noted that there is usually only <br />times emergency vehicle access is maintained at all <br />7acces?D?obTem. T'k"*! T of directional boring eliminates alot <br />navJno r ^ Consideration in the design Kellogg noted that <br />paving IS done half at a time to allow for access on the other half Some traffic delay <br />occurs dunng that time.
The URL can be used to link to this page
Your browser does not support the video tag.