Laserfiche WebLink
f'- <br />■f <br />p- <br />I <br />Crystal Creek Subdivision - Version #9 (3/12/91) <br />March 13» 1991 <br />Page 3 of 3 <br />General Co«enta, Re: Septic Systems - <br />Each proposed lot contains approved primary and alternate <br />drainfield sites. All sites require mound systems due to soil <br />conditions. <br />Because road construction and swale construction will allow <br />grading traffic over a wide ranging area of this property^ and <br />because in many cases the two drainfield sites shown are the <br />available sites for a given lot, it is critical that those sites <br />be protected during road and swale/berm construction. Where <br />drainfield sites are relatively near actual grading areas, <br />fencing should surround those sites, where (i <br />posts”and^rope? ma*y suffice. These protected measures should <br />remain until all grading work on the property is complete. <br />In addition to the documentation needed for the relocated <br />drainfield sites on Lot 2, Block 2 and Lot 5, Block 3, a review <br />of the septic information submitted by S-P Testing and a review <br />of versions #1-8 of the site and grading plans reveals that <br />althonoh percolation/boring hole locations have been shorn, they <br />li^Yo not been numbered so it is impossible to known which hole is <br />which on each lot. This information is necessary and should be <br />provided by S-P Testing or shown on a copy of the plat drawings.