Laserfiche WebLink
PROJECT: Pumphouse Ho. 3 PAYMENT NO.:5 <br />PLACE: Orono, Minnesota FILE NO. :13950 <br />roMTRACTOR: Richmar Construction DATE : February 27. 1991 <br />STATEMENT OF WORK <br />Unit Esfd Quantity Amount <br />Contract Item Unit Pr ire Quantity To Date To Date <br />BASE BID, CONT’D. <br />Flow Meter L.S.2.100.00 L S 1002 2,100.00 <br />Check Valve L.S.2.600.00 L S 1002 2,600.00 <br />Chem. Feed Equipt.L.S.7,000.00 L S 1002 7,000.00 <br />Air Cond. & Ventilation > .S.7,250.00 L S 502 3.625.00 <br />Electrical (rough-in)L.S.6,500.00 L S 1002 6,500.00 <br />MCC 6 Controls L.S.31.200.00 L S 202 6.240.00 <br />Elec. Fixtures & Finish L.S.6.800.00 L S 1,700.00 <br />Install 4" topsoil, seed, <br />fertilizer & mulch Acre 4,000.00 0.5 <br />TOTAL BASE BID WORK $154,760.5C <br />ALTERNATE NO. 1 <br />Substitute preformed wall & roof panels <br />in lieu of wood shakes on the mansard <br />roof as ADD or DEDUCT <br />TOTAL ALTERNATE NO. 1 <br />L $$2,900.00 L S <br />$0.00 <br />CHANGE ORDER NO. 1 <br />PART A - SOFT START TYPE STARTER <br />Revise motor starting equip, to a <br />size 3 Allen Bradley soft start <br />TOTAL PART A - ADD <br />139S0PR <br />L.S.$3,360.00 <br />Page 2 <br />$0.00