AIA®Document G701®– 2017 <br />Change Order <br />AIA Document G701 – 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017. All rights reserved. “The American Institute of Architects,” <br />“American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of <br />Architects.This draft was produced at 10:53:25 CT on 07/28/2023 under Order No.2114372515 which expires on 10/11/2023, is not for resale, <br />is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents®Terms of Service. To report <br />copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes:(3B9ADA41) <br />1 <br />PROJECT:(Name and address)CONTRACT INFORMATION:CHANGE ORDER INFORMATION: <br />City of Orono Public Works Facility <br />365 Old Crystal Bay Rd. N <br />Orono, MN 55356 <br />Contract For: General Construction Change Order Number: 03 <br />Date: October 10, 2022 Date: 11/02/2023 <br />OWNER:(Name and address)ARCHITECT:(Name and address)CONTRACTOR:(Name and address) <br />City of Orono <br />2750 Kelley Parkway <br />Orono, MN 55356 <br />Oertel Architects, Ltd. <br />1795 St. Clair Avenue <br />St. Paul, MN 55105 <br />Ebert Construction <br />23350 County Road 10 <br />Corcoran, MN 55357 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon <br />adjustments attributable to executed Construction Change Directives.) <br />Site Concrete & Survey: $2,968.00 <br />Bulk Fluid Masonry: $6,840.69 <br />Plumbing: $9,226.26 <br />Overhead Door Bracing: $2,582.72 <br />Radiant Heater Relocation: $2,040.19 <br />Dryer Vent: $2,802.48 <br />Reinforce Bulk Fluid Rack: $332.64 <br />Fan Mounts: $907.20 <br />Radiant Heater Roofing: $5,308.80 <br />Thermal Paint: $(2,283.00) <br />Mechanical Changes: $4,197.15 <br />Additional Electric: $13,103.13 <br />Owner Requested Electrical: $7,796.11 <br />Knox Box, Light Fixtures, AC: $4,920.08 <br />Plumbing Floor Drains: $2,215.66 <br />Plumbing and Electrical: $(3,889.88) <br />Roof Hydrants: $849.25 <br />Allowance #1: $(9,529.34) <br />The original Contract Sum was $16,067,000.00 <br />The net change by previously authorized Change Orders $50,945.53 <br />The Contract Sum prior to this Change Order was $16,117,945.53 <br />The Contract Sum will be increased by this Change Order in the amount of $50,388.14 <br />The new Contract Sum including this Change Order will be $16,168,333.67 <br />The Contract Time will be unchanged by Zero (0) days. <br />The new date of Substantial Completion will be April 18, 2024 <br />NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, <br />that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br />Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Oertel Architects Ebert Construction City of Orono <br />ARCHITECT (Firm name)CONTRACTOR (Firm name)OWNER (Firm name) <br />109