AIA®Document G701®– 2017
<br />Change Order
<br />AIA Document G701 – 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017. All rights reserved. “The American Institute of Architects,”
<br />“American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of
<br />Architects.This draft was produced at 10:53:25 CT on 07/28/2023 under Order No.2114372515 which expires on 10/11/2023, is not for resale,
<br />is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents®Terms of Service. To report
<br />copyright violations, e-mail docinfo@aiacontracts.com.
<br />User Notes:(3B9ADA41)
<br />1
<br />PROJECT:(Name and address)CONTRACT INFORMATION:CHANGE ORDER INFORMATION:
<br />City of Orono Public Works Facility
<br />365 Old Crystal Bay Rd. N
<br />Orono, MN 55356
<br />Contract For: General Construction Change Order Number: 03
<br />Date: October 10, 2022 Date: 11/02/2023
<br />OWNER:(Name and address)ARCHITECT:(Name and address)CONTRACTOR:(Name and address)
<br />City of Orono
<br />2750 Kelley Parkway
<br />Orono, MN 55356
<br />Oertel Architects, Ltd.
<br />1795 St. Clair Avenue
<br />St. Paul, MN 55105
<br />Ebert Construction
<br />23350 County Road 10
<br />Corcoran, MN 55357
<br />THE CONTRACT IS CHANGED AS FOLLOWS:
<br />(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon
<br />adjustments attributable to executed Construction Change Directives.)
<br />Site Concrete & Survey: $2,968.00
<br />Bulk Fluid Masonry: $6,840.69
<br />Plumbing: $9,226.26
<br />Overhead Door Bracing: $2,582.72
<br />Radiant Heater Relocation: $2,040.19
<br />Dryer Vent: $2,802.48
<br />Reinforce Bulk Fluid Rack: $332.64
<br />Fan Mounts: $907.20
<br />Radiant Heater Roofing: $5,308.80
<br />Thermal Paint: $(2,283.00)
<br />Mechanical Changes: $4,197.15
<br />Additional Electric: $13,103.13
<br />Owner Requested Electrical: $7,796.11
<br />Knox Box, Light Fixtures, AC: $4,920.08
<br />Plumbing Floor Drains: $2,215.66
<br />Plumbing and Electrical: $(3,889.88)
<br />Roof Hydrants: $849.25
<br />Allowance #1: $(9,529.34)
<br />The original Contract Sum was $16,067,000.00
<br />The net change by previously authorized Change Orders $50,945.53
<br />The Contract Sum prior to this Change Order was $16,117,945.53
<br />The Contract Sum will be increased by this Change Order in the amount of $50,388.14
<br />The new Contract Sum including this Change Order will be $16,168,333.67
<br />The Contract Time will be unchanged by Zero (0) days.
<br />The new date of Substantial Completion will be April 18, 2024
<br />NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time,
<br />that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
<br />Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
<br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
<br />Oertel Architects Ebert Construction City of Orono
<br />ARCHITECT (Firm name)CONTRACTOR (Firm name)OWNER (Firm name)