My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
05-28-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2024 12:35:40 PM
Creation date
5/23/2024 3:06:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date: May 28, 2024 Item: 17 <br />Presenter: Adam Edwards, City Administrator / Engineer <br />Section: City Administrator/Engineer Report <br /> <br />Title: Public Works Facility (21-039)- Change Order 3 <br /> <br /> <br />1.Purpose: <br />The purpose of this action item is formal council approval of Change Order 3 to the Public Works <br />Construction contract. <br />2.Background: <br />On October 10 th, 2022 Council awarded the contract to build the new Public Works facility. Construction is <br />under way. To date there have been a several necessary changes to the project which involve increased costs. <br />Change order #2 was reviewed and approved on November 27, 2023. The project is now near completion. <br />3.Summary: <br /> <br />Item Cost <br />Site Concrete & Survey: $2,968.00 <br />Bulk Fluid Masonry: $6,840.69 <br />Plumbing: $9,226.26 <br />Overhead Door Bracing: $2,582.72 <br />Radiant Heater Relocation: $2,040.19 <br />Dryer Vent: $2,802.48 <br />Reinforce Bulk Fluid Rack: $332.64 <br />Fan Mounts: $907.20 <br />Radiant Heater Roofing: $5,308.80 <br />Thermal Paint: $(2,283.00) <br />Mechanical Changes: $4,197.15 <br />Additional Electric: $13,103.13 <br />Owner Requested Electrical: $7,796.11 <br />Knox Box, Light Fixtures, AC: $4,920.08 <br />Plumbing Floor Drains: $2,215.66 <br />Plumbing and Electrical: $(3,889.88) <br />Roof Hydrants: $849.25 <br />Allowance #1: $(9,529.34) <br /> <br />4.Cost: <br />Project Cost Impact. After Change order 3 the % change = +.63%. The planned construction contingency <br />for this project was $100,000 <br />AGENDA ITEM <br /> <br /> <br /> <br /> <br /> <br />107
The URL can be used to link to this page
Your browser does not support the video tag.