Laserfiche WebLink
f <br />\ ► <br />r <br />' <br />M- <br />^v. <br />'r- <br />1^: <br />t: <br />.hx <br />^TnHiiH^vn h}IM^ <br />TOs John R. Gerhardson, Public Works Director <br />Lyle Oman# Building Official <br />Date:February 5# 1991 <br />Subject: Repair of Lumber Yard Building/Equipment Shed <br />On February 1» 1991 an inspection was conducted on the <br />lumber yard building to determine what would be required to <br />repaid the leaking roof. .Tt is my opinion that the building is <br />bo* v.pair and if someone was to request a permit to repair a <br />bu in this condition on private property, I would deny the <br />pax. commence hazardous building action. Structural <br />daficittt'wiwi:* and deterioration starts at the roof and continues <br />doum to the foundation. <br />- Roofing is leaking and is past its life expectancy. <br />- Roof sheathing is rotced. <br />- Rafters are overspan and rotted. <br />— Beams are overspan and rotted and many are spliced <br />together at mid-span instead of being a solid member between <br />bearing points. <br />- Posts are rotted, undersized and are *).c> longer plvunb. <br />- Foundation is crumbling and bearing points are unstable. <br />- The whole building is leaning toward Brown Road. <br />It i. my recommendation that all equipment and materials <br />should b removed as soon as possible and the building be secured <br />until it can be removed.