Laserfiche WebLink
■ ' <br />IttTERNATIVE 2 - FORCEMAIN 6 GRAVITY SYSTEM <br />14* O.I.P (Forcemain)550 L.F.8 15 “$ 8,250 <br />18* K.C.P.430 L.F.e 15 =6,450 <br />Manholes 3 EACH e 600 s 1,800 <br />Lift Station LUMP SUM 40,000 <br /># <br />18” Concrete Apron 1 EACH 9 300 -300 <br />Rip->Rap 4 C.Y.9 20 =80 <br />Restoration LUMP SUM 2,000 <br />Contingencies 5,820 <br />Total Construction Cost $64,700 <br />Engineering, Legal & Administrative 6,500 <br />Total Project Cost $71,200 <br />I <br />. I