Laserfiche WebLink
I.. <br />pr-f'> <br />' <br />■ <br />S.’! <br />Ii;> . <br />ROUTE A <br />ALTERNATIVE 1 - ALL GRAVITY SYSTEM <br />27* R.C.P.670 L.F.0 20 •$13,400 <br />27” Concrete Aprons 2 EACH 0 350 -700 <br />Menholes 2 EACH 0 600 -1,200 <br />Jacking 60 L.F.0 125 7,500 <br />Rip-Rap 4 C.Y.0 20 *80 <br />Dragline Excavation 1,300 C.Y.0 2 2,600 <br />Tree Removal LUMP SUM 1,000 <br />Restoration LUMP SUM 1,500 <br />Contingencies 2,800 <br />■Total Construction Cost $30,780 <br />Engineering, Legal & Administrative 4,600 <br />Total Project Cost $35,380 <br />V :. • •