Laserfiche WebLink
Pumphou8« No. 3 PAYMENT NO.sPLACEi Orono. Hinnasota FILE NO. s 13950CONTBACTOR: Richnar Construction DATE:February 4. 1991 <br />STATEMENT OF WORK <br />Unit Est' d Quantity Amount <br />Contract Itto Unit Price Quantity To Date To Date <br />PASE BID. CONT'D. <br />Plow Hater L.S.2.100.00 L S loor 2.100.00 <br />Chock Valve L.S.2.600.00 L S lOOZ 2.600.00 <br />Chaai. Paed Equipt.L.S.7.000.00 L S 902 6.300.00 <br />Air Cond. 6 Ventilation L.S.7,250.00 L S 502 3.625.00 <br />tlactrlcal (rough*in)L.S.6.500.00 L S 1002 6.500.00 <br />MCC i Controls L.S.31,200.00 L S 202 6.240.00 <br />Blac. Plxturas k Finish L.S.6.800.00 L S <br />Inatall A* topsoil, seed, <br />fartllltar k aulch Acre 4.000.00 0.5 <br />TOTAL BASE BID VOIK <br />iljMIfUl !«o» \ <br />Biikititttt* prvfonMd wall I roof panolt <br />la llott of wood ahakaa on tha oaniard <br />roof aa ADO or DEDUCT L S $2,900.00 L S <br />TOTAL ALTEINATE NO. 1 <br />« OP. i <br />fAET A « iOFT BTABT TYPE STABTEB <br />itvlro ootor starting oqulp. to a <br />•iso B Allan Bradlay soft start L.S.$3,360.00 <br />TOTAL PAET A - ADD <br />Page 2 <br />UfSOPB <br />$149,260.30 <br />$0.00 <br />$0.00