My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1991 Council Packet
Orono
>
City Council
>
1991
>
02-11-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 11:12:41 AM
Creation date
5/20/2024 11:07:13 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
603
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
mm <br />5. Lots 1 and 2 have been found to savisfy all rural <br />standards of the RR-IB zoning district. <br />6. Outlot A has been created for the sole purpose of access. <br />The access road within Outlot A shall serve Lots 1 and 2. <br />Applicants shall develop covenants for the maintenance of <br />the road and culverts and' the responsibility for maintenance <br />of yard areas within the dry buildable portion of Outlot A <br />and eastern portion of Lot 2. <br />7. Outlot B has been created to define the remaining portion <br />of the property for future development. Outlot B contains <br />no structures as of this platting and serves as open space <br />areas consisting of the greens area of the golf course. <br />NOW, THEREFORE BE IT RESOLVED, that based upon one or <br />more of the findings noted above, the City Council of the City of <br />Orono hereby approves the preliminary plat of Fairway Hills <br />Addition per the survey dated December 14, 19v0, revised January <br />22, 1991 by Raymond A. Prasch of Lot Surveys Company, Inc., <br />subject to the following conditions; <br />1. The installation of utilities and driveway within Outlot <br />A shall be subject to the conditions set forth in the <br />resolution approving a conditional use permit and variance <br />for all land alterations. <br />2. Building permits for residential construction on both <br />Lots 1 and 2 shall be issued by the City of Orono. Sewer <br />and water permits shall be issued by the City of Orono for <br />Lot 2. If Lot 1 is to be served by municipal sewer and <br />water, permits shall be issued by_ _ _ _ _ _ _ _ __. The <br />billing for sewer and water usage shall the responsibility <br />of the City of Orono. <br />3. Building permits will not be issued for new construction <br />until the plat is granted final approval and utilities are <br />installed and the access road has been approved by the City <br />Engineer for safe use by municipal inspection vehicles. <br />Final utilities plans and road construction plans must be <br />approved by the City Engineer prior to installation. The <br />City will ask applicants to execute a developers' agreement <br />and provide a letter of credit to cover 150% of the cost of <br />the proposed improvements. <br />Page 2 of 4
The URL can be used to link to this page
Your browser does not support the video tag.