Laserfiche WebLink
MONO CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> NO. 7477 <br /> -'-ESH00' <br /> B3.Designed by a registered engineer or landscape architect, depending on project <br /> scope; the Owners have provided an updated certificate of survey and engineered <br /> wall construction plan from a registered engineer and/or surveyor supporting the need <br /> for the currently proposed number and location of replacement walls. This criterion <br /> has been met; and <br /> B4.Designed to be the minimum size necessary to control the erosion problem. The <br /> Owners have provided a plan and statement from a licensed professional supporting <br /> the proposed landscaping and replacement wall solution. This criterion has been met. <br /> In addition, Municipal Code Section 78-196 provides a list of conditions supporting CUP <br /> issuance. The City Council may grant a CUP as applied for or in modified form. Based on the <br /> application and the evidence submitted, the Council must find that the proposed use at the <br /> proposed location is or will be: <br /> B5.Consistent with the community management plan; the new walls and landscape plan will <br /> help to preserve the lake slope. Protection and preservation of the natural lake shoreline <br /> is an identified priority of the Comprehensive Plan. This criterion has been met. <br /> B6. Compliant with the zoning code, including any conditions imposed on specific uses as <br /> required by article V, division 3 of the City Code; retaining walls within the lake yard are <br /> permitted where they are deemed necessary to protect the integrity of the slope. The <br /> Owners'engineer provided a statement indicating the need for the proposed walls and <br /> plantings. This criterion has been met. <br /> B7.Adequately served by police, fire, roads, and stormwater management; the property <br /> meets this standard. <br /> B8.Provided with an adequate water supply and sewage disposal system; the property <br /> meets this standard. <br /> B9.Not expected to generate excessive demand for public services at public cost; the <br /> retaining wall project should not generate an excessive demand for public services at a <br /> public cost. This criterion has been met. <br /> B10. Compatible with the surrounding area as the area is used both presently and as it is <br /> planned to be used in the future; the installation of replacement stone retaining walls <br /> 3 <br />