My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
05-13-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 10:28:20 AM
Creation date
5/10/2024 12:39:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fee <br />Sewer (Includes one inspection)$150.00 <br />SAC (Sewer Availability Charge) (MCES)$2,485.00 <br />Water (Includes one inspection)$150.00 <br />Horn Quote Basis <br />Additional Connection inspection (Water or Sewer) $100.00 <br />Additional Disconnection inspection (Water or Sewer)$100.00 <br />Residential - City Inspection $250.00 <br />Residential - Private Inspection Review $100.00 <br />Commercial $750.00 <br />Connection to existing City Sewer System: $6,000 per unit <br />Fee <br />2010 North Farm Road 23,280.00$ <br />2014 Green Trees 24,780.00$ <br />2015 Green Trees Extension 23,670.00$ <br />Connection to Sewer System in adjacent city <br />Exhibit C Utility Rates and Fees <br />Connection fees have been determined as a way to provide a fair and equitable recovery of the costs associated with providing water and wastewater utility <br />services to new customers to avoid placing these costs on existing customers. The connection fee includes those portions of existing assets that will benefit <br />new customers together with any anticipated future capital improvements constructed for the purpose of providing utility services to new customers. The <br />connection charge applies to those properties not previously assessed for the associated utility project. <br />Connection to City Sewer in areas still within their assessment window (less than 15 years since project was assessed) shall pay an amount equivalent <br />to the assessment amount plus interest that residences were charged at the time of the project: <br />MUNICIPAL CONNECTION PERMIT <br />SEWER PROJECTS <br />ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES <br />POINT OF SALE SEWER SERVICE INFLOW & INFILTRATION INSPECTION FEES <br />45
The URL can be used to link to this page
Your browser does not support the video tag.