My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
05-13-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 10:28:20 AM
Creation date
5/10/2024 12:39:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Christine Lusian
Created:
5/10/2024 12:43 PM
Modified:
5/10/2024 12:43 PM
Text:
https://legistarweb-production.s3.amazonaws.com/uploads/attachment/pdf/2604261/Orono_Equipment_Garage_Addition_Drawings__site_plan_and_layout.pdf
ID:
2
Creator:
Christine Lusian
Created:
5/10/2024 12:43 PM
Modified:
5/10/2024 12:43 PM
Text:
https://legistarweb-production.s3.amazonaws.com/uploads/attachment/pdf/2613478/Orono_-_Equipment_Garage_Addition_-_DPG_Estimate_05-09-24.pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date: May 13, 2024 Item: 21 <br />Presenter: Adam Edwards, City Administrator / Engineer <br />Section: City Administrator/Engineer Report <br /> <br />Title: Navarre Garage Additions (24-034) - Award <br /> <br /> <br />1.Purpose: <br />The purpose of this item is to award Navarre Garage Addition Project. <br />2.Background: <br />At the March 11, 2024 council meeting staff was directed to design and addition for the existing <br />storage garage at the Navarre Water Plant. Oertel Architects prepared the designs and <br />specification sheets for the addition and city staff solicited quotes from local construction <br />companies. The addition will be used to store some Orono fire equipment until the return of the <br />Navarre Fire Station at which time the facility will revert back to general equipment storage for <br />multiple city departments. <br />3.Scope: <br />The scope of the project is to construct and 14 x 36 foot addition to the water plan garage. (See <br />Exhibit A for Site plan and Building Floor Plan) <br />4.Cost: <br />Four quotes were solicited and two received. The low quotes was from Dering Pierson Group <br />(DPG) for $169,513.46. The other quote received was from Ebert Construction for $172,900.00. <br />5.Funding: <br />The project will be funded by the Facilities Fund, which includes $3,000,000 for fire facilities <br />from the 2021 facilities bond. <br />6.Staff Recommendation: <br />I recommend acceptance of the quote provided by DPG <br />AGENDA ITEM <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />COUNCIL ACTION REQUESTED <br />Accept quote from DPG for $162,513.46 to construct an addition at the Navarre water plant garage. <br />Exhibits <br />A. Orono equipment garage addition site plan and layout.pdf <br />B. Orono - Equipment Garage Addition - DPG Estimate 05-09-24.pdf <br />216
The URL can be used to link to this page
Your browser does not support the video tag.